From 2016 to 2022 the Philippines launched its most ambitious infrastructure drive, Build, Build, Build, promising a ’golden age of infrastructure’ worth ₱8–9 trillion. Public infrastructure spending rose to above 5% of GDP. But only a fraction of the flagship projects were completed by 2022. What does the programme teach about public investment?

Suggested for: MBA public finance · Project management · Infrastructure economics · Facts as of 22 November 2026

Programme size₱8–9tnOver six years
Infra spending 2021₱1.12tn5.8% of GDP
Flagship projects119After revisions
Completed by 2022~15Of flagship list
01 · The situation

What happened

The Philippines has long suffered from poor infrastructure. Traffic in Metro Manila ranks among the worst in the world, ports and airports have been congested, and many rural areas lack good roads, bridges and irrigation. Infrastructure spending had been low by regional standards, often below 3% of GDP.

When Rodrigo Duterte became president in 2016, his administration launched Build, Build, Build, a programme to raise public infrastructure spending to 5% to 7% of GDP. It promised investments of ₱8 trillion to ₱9 trillion over six years, covering roads, bridges, railways, airports, seaports, flood control and other projects. The programme started with 75 big-ticket flagship projects, later revised to 112 and then 119.

Funding came from the national budget, foreign development loans and public–private partnerships. Official development assistance from Japan, China, the Asian Development Bank and the World Bank financed many large transport projects. Of the flagship projects, more than half by value were to be funded by foreign loans and grants.

Spending rose substantially. Public infrastructure disbursements exceeded ₱1 trillion for the first time in 2019, at about 5.4% of GDP, and reached a record ₱1.12 trillion, or about 5.8% of GDP, in 2021, despite the pandemic. Officials said this was far above historical norms and created millions of jobs. Thousands of smaller projects, such as roads, schools and flood control structures, were built across the country.

But the big flagship projects moved slowly. By late 2020, only about a dozen of 119 flagship projects had been completed. By the end of the Duterte administration in mid-2022, analysts counted around 15 completed. Many large projects, such as the Metro Manila Subway and long-distance railways, were still under construction or in early stages.

Several factors slowed progress. Large projects require years of planning, feasibility studies, land acquisition and right-of-way clearance, which often involve disputes with landowners and informal settlers. Foreign-funded projects follow lender procurement rules. The pandemic halted construction for months. Some projects with Chinese financing were delayed or dropped. The flagship list was revised several times, making progress hard to track.

Supporters argued that the programme’s main achievement was raising infrastructure spending to a new level and building a pipeline of projects for future administrations. Officials said the headline measure of success was spending as a share of GDP rather than the number of flagship projects completed. Critics said the programme overpromised, that completed flagship projects were mainly those begun under previous administrations, and that execution capacity was weak.

The Marcos administration that took office in 2022 replaced Build, Build, Build with Build Better More, continuing many of the same projects and targeting infrastructure spending of 5% to 6% of GDP. Its list grew to about 185 flagship projects worth about ₱9 trillion.

Later, allegations of corruption in flood control projects in 2025 raised wider concerns about the quality and integrity of public works spending, highlighting the importance of monitoring and auditing.

The Build, Build, Build experience is common among developing countries. Increasing spending is easier than delivering complex projects on time. Strong project preparation, land acquisition processes and procurement capacity are critical.

For investors, infrastructure programmes create opportunities for construction firms, cement and steel producers, and banks financing projects, but delays can affect revenues and profits.

For students, the programme is a case in public investment management, the economics of infrastructure, project delivery risk and the political economy of large programmes.

The economic case for infrastructure is strong in principle. Better roads, ports and railways lower transport costs, connect rural producers to markets, attract investment and raise productivity. But the benefits depend on choosing the right projects and completing them efficiently. Poorly chosen or delayed projects tie up capital without delivering returns.

Public investment management systems help governments choose and deliver projects. They include economic appraisal of costs and benefits, independent review, transparent procurement and monitoring. Countries with stronger systems tend to get more value from each peso spent.

Debt is another consideration. Much infrastructure was financed with foreign loans, adding to government debt. Projects that raise growth can pay for themselves over time by increasing tax revenue, but those that do not can leave a burden for future taxpayers.

Infrastructure also creates long-term maintenance obligations. Roads, bridges and railways need regular upkeep; neglecting maintenance can shorten asset lives and waste earlier investment.

The programme also reshaped the construction industry, as contractors, cement producers and steel suppliers expanded capacity to meet demand, making them sensitive to the pace of public spending.

02 · Timeline

Key moments

  1. Build, Build, Build launched.

  2. 75 flagship projects announced.

  3. Infra spending passes ₱1 trillion (5.4% of GDP).

  4. Pandemic halts construction for months.

  5. Record ₱1.12tn spent (5.8% of GDP).

  6. Programme succeeded by Build Better More.

03 · Exhibit
Exhibit 1 · Public infrastructure spending under Build, Build, Build
% of GDP5.420195.820217.0Original 2022 target

Sources: Inquirer; Senate Economic Planning Office.

04 · Core tensions

The trade-offs at the heart of the case

Spending vs. completion

Money flowed but big projects lagged.

Speed vs. preparation

Rushed projects stall later.

Domestic vs. foreign funding

Loans bring rules and delays.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    Why does the Philippines have an infrastructure gap?

  2. Q2

    Should success be measured by spending or completed projects?

  3. Q3

    What slowed the flagship projects?

  4. Q4

    How should governments prepare large infrastructure projects?

  5. Q5

    What should Build Better More do differently?

Frameworks worth applying
  • Public investment management
  • Infrastructure economics
  • Project delivery risk
  • Public–private partnerships
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

Build, Build, Build succeeded in raising infrastructure spending to a new level, but overpromised on flagship projects. The binding constraint was project preparation and execution, not money. Future programmes should promise less and deliver more.

  1. Prepare projects

    Invest in feasibility studies and land acquisition early.

  2. Report transparently

    Publish progress on every flagship project.

  3. Strengthen audits

    Monitor quality and corruption risks.

  4. Use PPPs wisely

    Share risk with capable private partners.

What this plan gives up

Careful preparation delays visible results within a single presidential term.

The strongest counter-argument

Supporters argue the programme laid foundations that later administrations are completing and created millions of jobs.

Metrics to watch

  • Infrastructure spending ratio
  • Flagship completion rates
  • Metro Manila Subway progress
  • Audit findings
  • PPP awards
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.