What happened
Under the contracting model the authority planned services and retained fare revenue. Operators competed to deliver a specified service. Tower Transit won the first package in 2015, covering twenty-six services with an estimated five-year fee of S$556 million. Dividing the fee by the number of routes would produce an average with little meaning. A long route using peak-only buses needs different resources from a short service running throughout the day.
Tower Transit’s award covered services associated with the Jurong East, Bukit Batok and Clementi interchanges as well as the Bulim depot. Linking services through a depot can reduce empty movements and make cover drivers more useful. It can also concentrate disruption if a single staffing shortage affects several routes. The winning package price therefore reflected a particular network of services, not a universally transferable cost for operating a Singapore bus route.
Tender design changes who can enter. A new operator may bring working methods from another city but lack local information on boarding patterns or driver recruitment. Access to buses and facilities can remove one barrier without eliminating these operating uncertainties. The authority can make tenders more comparable by providing service data and then testing how each bidder plans to handle an awkward peak at a specific interchange.
The Bulim depot can hold about 550 buses, and under the model it belongs to the government rather than the operator. That lowers the cost of entry for new bidders, who do not need to buy land or a fleet, and makes it easier to switch operators at the end of a contract without disrupting passengers. Today four operators run all public buses across 14 packages.
Singapore announced in May 2014 that it would move public buses to a government contracting model. Under it, the government owns the buses, depots and fare revenue, and pays operators a fee to run routes to set standards. The first package, Bulim, was awarded in May 2015 to Tower Transit Singapore, part of a London-based group, for an estimated S$556 million over five years, covering 26 services from the new Bulim Bus Depot.
Tower Transit began operating in May 2016, and the whole industry moved to the model in September 2016. New entrants Tower Transit and Go-Ahead joined incumbents SBS Transit and SMRT Buses. When the Bulim package was re-tendered in 2020, LTA again chose Tower Transit, whose five-year bid of about S$482 million was not the lowest; SBS Transit had bid about S$443 million.
This is a gross-cost contract: the operator is paid for running buses, while the government keeps fare revenue and bears the risk of ridership changes. That differs from a net-cost model, where operators keep fares and bear demand risk. Gross-cost contracts make it easier for new operators to bid and for planners to change routes, but taxpayers bear more risk. London has used similar contracts for decades.
Key moments
LTA announced the first bus contracting package.
Tower Transit won the Bulim tender.
The operator began taking over the services.
Tower Transit kept the package in 2020 despite not being the lowest bidder; LTA weighs quality as well as price. Sources: Land Transport Guru; LTA bid prices (2020).
The trade-offs at the heart of the case
A roster beneath a route map
A bus running every few minutes can require an extra vehicle when congestion lengthens the round trip by only a small amount. The driver and bus cannot be bought for just those few additional minutes. Inspect a roster that crosses that threshold and compare it with one that narrowly avoids it. The marginal cost of a timetable change can jump even when average cost barely moves. The operator’s employees carry knowledge that an incoming company cannot read from the tender. An experienced driver knows where passengers need extra boarding time and where a scheduled recovery minute has little practical value. A transition that loses those drivers may create an early service deterioration even if the winning operating plan was sensible. A transition that retains everyone at inflated overtime rates can make the headline award look cheaper than its true resource cost. Study retention, unfilled duties and customer waiting together before attributing the first months of performance to the contracting model itself.
For your seminar, paper or interview
- Q1
How would you compare two tenders with different assumptions about spare drivers?
- Q2
Who should decide whether to retain a lightly used service?
- Q3
Which measure detects two buses arriving together?
- Q4
How would you test whether construction diverting traffic away from the normal route explains the evidence?
- Q5
Which observation would most change your estimate of the cost of a dependable headway, and why?
- Gross-cost contracting
- Competitive tendering
- Performance incentives
- Public service obligations
How we would approach it
Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.
Evaluate bids using a model roster, including paid time outside passenger service. Observe actual headways in busy and quiet periods. Concentrate on excess waiting and missed journeys alongside cost. For workers, a transfer between operators should preserve the people who know the routes while allowing the new operator to organise its workforce effectively.
Tender in packages
Group routes around a depot so new operators can enter without owning buses or land.
Pay for reliability
Link part of the fee to bus arrival regularity and service quality, not only to kilometres run.
Weigh quality with price
Score bids on operating plans and track record as well as cost, as LTA did in 2020.
What this plan gives up
Competitive tenders lower costs and bring in new operators, but frequent changes of operator can disrupt staff and service, and the government bears ridership and fare risk.
The strongest counter-argument
Fare revenue risk can give a company a direct incentive to attract riders that a fixed service fee weakens. A carefully chosen quality payment may restore part of that incentive, but rewarding raw ridership can penalise an operator serving a neighbourhood disrupted by unrelated construction.
Metrics to watch
- excess wait relative to the timetable or target headway
- the cost of a dependable headway
- Bus service reliability scores
- Contract prices at re-tender
Propose your solution
Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.
Published solutions
Loading published solutions…
- Tower Transit · Bulim contract award ↗
- LTA · First bus package announcement ↗
- CNA · Contract award and five-year estimated fee ↗
- Land Transport Guru: Bulim Bus Package, first term ↗
- LTA: Bid prices for Bulim and Sembawang-Yishun packages (2020) ↗