PUB and Keppel

Marina East buys the option to change its water source

A desalination plant normally earns its place by working when rain does not fall. At Marina East, Singapore added the ability to use reservoir water when it was available. The value of the second intake therefore depends on how often the cheaper source can actually be used.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

Production capability137,000 m³/day
Water sourcesTwo
LocationMarina East
Commercial start2020
01 · The situation

What happened

PUB described the Keppel Marina East plant as Singapore’s first large-scale dual-mode facility. It can treat seawater or freshwater from Marina Reservoir and can produce up to 137,000 cubic metres of drinking water a day. Opening a second path into a treatment system does more than create an engineering curiosity. Water with a lower salt content can require less energy to process, while the seawater option remains available in dry conditions.

Commercial operation began in June 2020, while the official opening ceremony was held in February 2021. For financial analysis, use the operating milestone when assessing service and the contract’s applicable start date when assessing payments. The public ceremony need not coincide with either. Measuring a ramp-up from the wrong date can make an operator look unexpectedly efficient or unfairly slow without any change in the performance of the plant.

A forecast using one average feedwater cost conceals the commercial choice. On wet days the reservoir may provide water that needs to be handled anyway. In a prolonged dry spell, the plant must be able to run in its more energy-intensive mode just as other demands on the system become pressing. Saving energy in ordinary conditions has to pay for the extra equipment, testing and operating capability.

There is another distinction between physical and commercial flexibility. A water-purchase agreement may specify who directs the change in mode and who bears energy costs. A technically sensible switch will not necessarily raise the operator’s earnings if the benefit flows to the purchaser under the contract. A tariff comparison between competing plant designs should put both into equivalent dispatch conditions before interpreting a lower price as superior efficiency.

The Keppel Marina East Desalination Plant began commercial operations on 29 June 2020 and was officially opened in February 2021. It is Singapore’s fourth desalination plant and its first large-scale dual-mode plant, able to treat either seawater or fresh water from Marina Reservoir. It can produce 137,000 cubic metres of drinking water a day, about 30 million gallons. The treatment equipment is underground, with a green roof open to the public.

Keppel won the contract in a tender that drew 16 bids, offering a first-year price of about S$1.08 per cubic metre. Its subsidiary Marina East Water runs the plant under a 25-year design, build, own and operate arrangement with PUB until 2045. In 2024 Keppel agreed to sell a 50% stake in Marina East Water to Keppel Infrastructure Trust at an enterprise value of about S$355 million.

Desalinating seawater uses much more energy than treating fresh water, so being able to switch sources is valuable. In wet weather the plant treats reservoir water at lower cost; in dry spells it uses seawater. This is a real option: paying more upfront for the right to choose later. The financing model is also common worldwide. A long-term contract with a government buyer gives predictable cash flows, which lets the developer borrow cheaply and later sell stakes to long-term investors seeking stable income.

02 · Timeline

Key moments

  1. The plant began commercial operations in June.

  2. The plant was officially opened in February.

03 · Exhibit
Exhibit 1 · Keppel Marina East Desalination Plant: key terms
Value137Capacity (thousand m³ per day)25Concession length (years)16Bids received in tender

Keppel won with a first-year price of S$1.07867 per cubic metre. In 2024 Keppel agreed to sell 50% of the plant’s owner to Keppel Infrastructure Trust at an enterprise value of about S$355m. Sources: Keppel/PUB; WaterWorld; IREI.

04 · Core tensions

The trade-offs at the heart of the case

The switch that has to be possible on the day

Review a spell during which reservoir water was available but seawater was used. There may have been a sensible operational reason, including testing, an intake constraint or a planned outage. The lost theoretical saving is not automatically poor performance. What matters to the contract is whether a mode was technically available, commercially preferable and permitted by the water authority at the same time. Suppose the electricity price rises on a dry day when only seawater is available. A design capable of using freshwater still has to buy the expensive energy in that state. A forecast built by multiplying average energy prices by average water consumption can miss the cost of this coincidence. Pair source availability and energy price observations by date, then test a prolonged dry period rather than shuffling the two independently. The result gives water planners a clearer indication of how much financial protection the second mode provides and where another form of protection would still be needed.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    Who should receive energy savings when the operator switches feedwater?

  2. Q2

    How would a dry year change the value of the second intake?

  3. Q3

    What would reveal that an apparently available mode cannot be used?

  4. Q4

    How would you test whether changes in source-water quality and system dispatch explains the evidence?

  5. Q5

    Which observation would most change your estimate of the usable value of operating flexibility, and why?

Frameworks worth applying
  • Real options
  • Design-build-own-operate contracts
  • Energy cost management
  • Long-term offtake agreements
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

Assess the incremental investment against an otherwise comparable seawater-only plant. Keep a record of the hours each mode is available, which mode is called upon and why. A plant dispatched for water security may look inefficient in accounts that reward only lower electricity consumption.

  1. Switch with the weather

    Treat reservoir water when rain is plentiful, which uses less energy, and seawater in dry spells.

  2. Lock in a long-term buyer

    Use a 25-year water purchase agreement so the operator can finance the plant at low cost.

  3. Recycle capital

    Sell part of the stabilised asset to an infrastructure trust and reinvest the proceeds.

What this plan gives up

A dual-mode plant costs more to build than a single-source one, but the flexibility to choose the cheaper water source lowers energy costs and adds resilience during droughts.

The strongest counter-argument

A simpler plant offers benefits of its own. Fewer changes of operating state can mean easier maintenance, simpler training and fewer assumptions in a supply contract. The dual-mode design earns its premium only if the flexibility remains usable after operating constraints and maintenance outages are taken into account.

Metrics to watch

  • electricity consumed per cubic metre of compliant output
  • the usable value of operating flexibility
  • Share of output from reservoir versus seawater
  • Energy use per cubic metre
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…