Case study · PakistanInfrastructure debt2021Last reviewed 22 November 2026

Pakistan case studiesAsia-Pacific case studies

Water and Power Development Authority

A green bond with a dollar coupon

A green label tells a bondholder something about the intended use of money. A US-dollar coupon tells the borrower exactly which currency it must find on payment day. Those promises call for two different sets of accounts.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

AmountUS$500 million
CouponAbout 7.5 percent
Tenor10 years
01 · The situation

What happened

In May 2021 Pakistan’s Water and Power Development Authority launched a transaction to raise US$500 million through a ten-year green Eurobond known as the Indus bond. The issue was linked to the Diamer Bhasha and Mohmand dam projects. WAPDA’s financial statements specify an annual coupon of 7.5%, payable in two instalments each year, and redemption on 4 June 2031. A Eurobond in this instance was denominated in dollars, so the word in the instrument’s name should not be read as the currency of its payments.

At the reported rate, US$500 million outstanding for a full year implies around US$37.5 million in annual coupon expense before fees. The amount in rupees required to buy those dollars depends on the exchange rate when payments are made. Progress on construction can raise confidence in future generation without putting dollars into the issuer’s account before the next coupon date.

In May 2021 the Water and Power Development Authority issued Pakistan’s first green bond, called the Indus Bond. The 10-year, dollar-denominated bond raised US$500 million at about 7.5 percent and was listed on the London Stock Exchange. WAPDA said investors offered about US$3 billion, six times what it needed, which allowed it to tighten pricing from initial guidance close to 8 percent.

The proceeds were earmarked for two large hydropower projects, the Diamer-Bhasha and Mohmand dams. WAPDA said it needed about US$2.2 billion over five years for them, and that it raised the money on its own credit without a government guarantee. The coupon was only slightly above that of Pakistan’s own sovereign bond maturing in 2031, which paid 7.375 percent.

A planned second green bond was postponed because of rising global interest rates and domestic conditions. That left WAPDA with dollar debt for projects that will earn most of their revenue in rupees from electricity sales, a mismatch that grows more costly whenever the rupee falls.

Green bonds have grown into a global market worth trillions of dollars, and emerging-market issuers from Indonesia to Chile have used them to fund renewable energy and climate projects. Many of these issuers face the same currency question as WAPDA: the cheapest money is in dollars or euros, but the projects earn local currency.

For Pakistan, the Indus Bond showed that a state enterprise could reach global investors on its own credit. Repeating that success depends on the dams being completed on time and on Pakistan’s wider economic stability, both of which affect how investors price future issues.

The dams themselves are long-term projects. Diamer-Bhasha in particular is one of the largest hydropower projects in the world, and its timeline has been extended several times. Bondholders are repaid by WAPDA regardless of construction delays, but delays push back the revenue that is meant to service the debt.

02 · Timeline

Key moments

  1. May 2021 · WAPDA launches its dollar-denominated Indus bond

  2. 31 May 2021 · Formal launch identifies the two dam projects

  3. 4 June 2021 · Issue date of the ten-year notes

03 · Exhibit
Exhibit 1 · WAPDA’s Indus green bond, May 2021
US$ million500Amount raised3,000Orders received (reported)2,200WAPDA’s five-year need

Coupon about 7.5 percent for 10 years; Pakistan’s 2031 sovereign bond paid 7.375 percent. Sources: Dawn; Business Recorder.

04 · Core tensions

The trade-offs at the heart of the case

Core tensions

Local-currency borrowing could reduce a mismatch if project cash receipts arrive in rupees. International issuance can widen the investor base and make dollars available for imported works. The choice should also consider the term of domestic funding and the price of currency protection. Simply comparing the nominal percentage coupons can make the cheaper-looking option more expensive over its life.

The investor who wants evidence of impact

An international investor can ask for two reports. One accounts for proceeds assigned to eligible works and reconciles those assignments to disbursements. Maintaining an allocation ledger is necessary for the first report. It does not by itself establish the second. Changes in the power system can alter what a completed project actually displaces. A lender judging credit quality has a third set of questions. Does the borrower have access to dollars before the dams produce incremental cash? Are other commitments likely to require funding at the same time? Can the institution make payments if an expected reimbursement arrives late? Evidence of environmental benefit can influence investor demand and the price of future borrowing. It cannot discharge a coupon already due.

Green label, currency risk

Investors bought a green bond, but WAPDA bears a currency risk: its debt service is in dollars while its dam revenues will be in rupees. A large depreciation can make the debt much more expensive. Hedging is costly for long maturities, so the risk often remains with the issuer and ultimately with electricity consumers or taxpayers.

Proving the green impact

Green bond investors increasingly ask for evidence of environmental impact, not just that money was spent on eligible projects. Large dams have climate benefits from clean electricity but also social and environmental costs. Transparent reporting on both strengthens credibility for future issues.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    How large is annual coupon expense before fees?

  2. Q2

    Who can bear the currency risk if customers pay mostly in rupees?

  3. Q3

    Which exchange-rate exposure would remain after an auditor confirmed every eligible use of proceeds?

Frameworks worth applying
  • Green bonds
  • Currency mismatch
  • Use-of-proceeds reporting
  • Hydropower finance
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

Maintain a currency-by-currency debt service schedule alongside a separate use-of-proceeds and environmental reporting schedule. Test what happens when power receipts arrive late. An investor needs to be able to inspect both allocation to eligible works and the issuer’s ability to service the bond while those works are still under construction.

  1. Match currencies where possible

    Seek rupee or hedged funding for rupee revenues.

  2. Report impact

    Publish construction progress and environmental data.

  3. Plan refinancing

    Prepare for the 2031 maturity well in advance.

What this plan gives up

Dollar green bonds reach global investors cheaply but create currency mismatch.

The strongest counter-argument

Local-currency borrowing would have avoided currency risk but at much higher interest rates and with a smaller investor base.

Metrics to watch

  • Progress on Diamer-Bhasha and Mohmand
  • Rupee value of outstanding dollar debt
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.