Case study · BangladeshEnergy and utilities2007–2016 programme and subsequent reviewLast reviewed 22 November 2026

Bangladesh case studiesAsia-Pacific case studies

Dhaka Water Supply and Sewerage Authority

Dhaka’s water districts made a missing litre easier to find

A utility can pump more water and still bill for the same volume. Dhaka WASA’s district metered areas made it possible to ask a smaller, answerable question. How much water entered this defined network, and how much appeared in authorised consumption and customer accounts? Its account describes a network divided into 145 areas and 67 completed under the cited project, with non-revenue water in those areas falling from roughly 40 percent to around 5 percent.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

Planned subdivision described by Dhaka WASA145 areas
Completed in the cited project account67 areas
Non-revenue water change reported for those areasAbout 40% to 5%
01 · The situation

What happened

Those results describe selected areas, not all of Dhaka. Non-revenue water can include physical leakage and volumes affected by unauthorised use, under-registration or billing problems. Repairing a leak leaves more water available to customers or reduces the need to pump. Correcting a billing record may increase recognised revenue without saving a physical litre. Both improve financial performance, but the cash effects are quite different.

A district boundary is only useful if the utility knows what crosses it. A valve left open to an adjacent area, a meter reading taken on a different day or a change in supply pressure can produce an apparent gain or loss. Staff need to reconcile inflow, authorised use and billed volume across the same period. Independent checks on meter accuracy and the hours of service help distinguish a tidier ledger from a more reliable supply.

Where should the utility expand next? One choice is a district with the largest apparent percentage loss. Another is a district where water is scarce, pipe repairs are inexpensive and more low-income households can obtain reliable service. The second could create greater value even with a lower headline loss rate. Compare cash collected, operating cost, physical water saved and household service hours. A neighbourhood where previously unbilled users gain legal connections may show gains across several measures, but each should be demonstrated separately.

The Asian Development Bank approved the Dhaka Water Supply Sector Development Program in 2007 to help Dhaka WASA rehabilitate its supply system and strengthen its management. A central feature was dividing the network into district metered areas, each with measured inflow, so losses could be tracked area by area.

Dhaka WASA’s own account describes plans for 145 such areas, with 67 completed under the cited project and non-revenue water in those areas falling from about 40 percent to around 5 percent. An ADB report on a later loan described the same programme more broadly, saying the improved networks served about 7 million people and that losses had been cut from 40 percent to less than 15 percent.

ADB later approved a further US$275 million loan for water efficiency improvements in Dhaka, noting that physical losses remained a concern in many parts of the city. ADB has also published a study, The Dhaka Water Services Turnaround, presenting the utility’s experience as a model for others in South Asia.

Non-revenue water is a major issue for water utilities worldwide, especially in fast-growing cities. Every litre lost has already been treated and pumped, so cutting losses can be cheaper than building new supply. The district metered area approach is used from London to Manila. For anyone assessing a utility’s finances, non-revenue water is a key number: high losses mean high costs, weak revenue and pressure for tariff rises or subsidies.

02 · Timeline

Key moments

  1. Government project records date the water sector development programme to December.

  2. The project record gives June as the end of the programme period.

  3. Utility reporting described results in the completed metered areas.

03 · Exhibit
Exhibit 1 · Bangladesh: Urban access to at least basic drinking water
% of urban population98.2201298.4201698.62020

Source: World Bank, World Development Indicators (SH.H2O.BASW.UR.ZS).

04 · Core tensions

The trade-offs at the heart of the case

Check whether the missing litres were ever missing

Reconcile district inflow meters with household readings over the same billing dates and test a sample of customer meters. Where pressure has risen, check whether the new service also changes consumption. A billing gain after registration of an informal connection may be financially valuable without freeing physical water for another district. I would report separately water newly available, collectible revenue added and service improvement for existing households. If a neighbourhood has low purchasing power, it may merit investment for public health and equity even when the cash return is smaller. Those reasons should be shown explicitly alongside the financial account. Following a customer’s bill through collection is essential where the utility must pay today for repairs while the apparent revenue gain will take several billing cycles to arrive.

The water arriving and the wastewater leaving are related

Dhaka’s sanitation investment illustrates a side effect of improved water supply. If households receive more reliable water, they may generate more wastewater. A utility that improves supply while leaving downstream collection unchanged can increase pressure on neighbourhood drainage. The financial case for district metering should therefore include the changes it actually causes. Reducing physical leakage while maintaining delivery might decrease pumping without increasing wastewater. Bringing households a substantial increase in usable water could require additional sanitation capacity. Both outcomes can be beneficial, but they imply different future obligations. Sharing service forecasts across the utility’s water and sewer teams would prevent one project’s success from appearing as an unexplained cost overrun in the other.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    Which improvement would raise receipts without reducing leakage?

  2. Q2

    Why can a boundary valve corrupt a district balance?

  3. Q3

    How should the utility rank two districts with different service levels?

Frameworks worth applying
  • Non-revenue water
  • Measurement and control
  • Utility finance
  • Operational efficiency
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

We think dividing the network into metered areas was the turning point because it made losses measurable. Once a utility knows how much water enters each area and how much is billed, it can find leaks and illegal connections and decide where repairs pay off, instead of guessing across a whole city.

  1. Finish the remaining areas

    Extend metered areas across the whole network.

  2. Publish area-level losses

    Report non-revenue water by area so progress is visible.

  3. Keep meters accurate

    Budget for meter testing and replacement, since faulty meters bring losses back.

What this plan gives up

Strict enforcement against illegal connections improves revenue but can cut off poor households unless legal, affordable connections are offered.

The strongest counter-argument

Gains in pilot areas are often hard to sustain at scale, and some argue utilities should focus first on reliable 24-hour supply, which reduces pressure-related damage and the incentive to tap illegally.

Metrics to watch

  • Non-revenue water by metered area
  • Hours of supply per day
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.