All 51 case studies on companies, banks, governments and institutions in Bangladesh. Each case uses real, sourced figures, sets out the decision or crisis, and asks what you would do. See all case studies.
- Padma Bridge earns tolls. What do they measure?A lorry crossing the Padma pays a toll that becomes revenue for the bridge authority and a cost for the haulier. Counting the payment as a benefit to…
- How do you fund a pension when the accident has already happened?An injury payment made once and a pension paid throughout a period of disability can have the same initial instalment and very different financial…
- A bank account teaches more when wages arrive in itHanding a worker a new account and paying her through it every month are different interventions. A field experiment in Bangladesh factories…
- Can a faster border post release an exporter’s working capital?A truck at a border occupies more than a patch of road. Its cargo has been bought, its driver must be paid, and the customer may still refuse to pay…
- At Ghorashal, one successful megawatt test was not enoughAn older machine can be the most valuable part of an upgrade or the reason the entire upgrade underperforms. At Ghorashal, a new gas turbine was…
- A cheaper electronic tender can still buy an expensive roadAn electronic tender leaves a time-stamped record of who bid and at what price. It does not guarantee that a road survives its first monsoon.…
- The Jamuna rail bridge buys a timetable, one train path at a timeA freight operator buying a train path needs to know when the train will arrive, how much it can carry and whether a passenger service will take its…
- Who pays for what leaves a shipbreaking yard?A ship can arrive at a recycling yard as a source of valuable steel and leave behind materials that cost money to handle. The proceeds from selling…
- Bangladesh’s second sea cable sold capacity and insuranceTwo fibre routes can look wasteful on a quiet day and indispensable on the day one route fails. Bangladesh Submarine Cables joined the SEA-ME-WE 5…
- A polder protects only as well as the parts that still drainAn embankment can keep the tide outside and still leave farmland flooded from within. A coastal polder works as a system of defences, gates and…
- What Banglalink sold, and what it still had to rentA tower sale can put cash in a mobile operator’s account without moving a single customer to a new network. Banglalink agreed in November 2023 to…
- What Beximco actually won with its first US product launchRegulatory permission and a profitable market position appear on different calendars. Beximco Pharmaceuticals reported US approval for carvedilol in…
- Why a mobile wallet needs cash on both sides of townA garment worker in Dhaka can send money home in seconds. Her mother may still need a shopkeeper with enough notes in the till. The hard part of…
- Can a five-year bond fund a family home for much longer?A borrower choosing a monthly mortgage instalment is making a decision that may last well beyond five years. BRAC Bank’s housing bond gave the bank…
- Why BRAC gave an asset and time to learn how to earn from itA cow can be an income-producing asset and an immediate demand for feed, labour and care. A household with very little cash may have to sell a…
- At Patenga, whose stopwatch measures terminal performance?A vessel waiting outside port and a container sitting inside the yard both make customers wait. At Patenga the contract assigns different parts of…
- Why the public lender financed the water outside Bay TerminalA container terminal can charge for handling a box. Charging for the calmer water that lets several terminals operate is a different proposition. In…
- What is an extra year of operating Laldia worth?A terminal operator considering a new crane late in a concession has to ask who will own its remaining value. In November 2025 Chittagong Port…
- How much trading history does a small-business lender need?An established shop can show a lender two years of receipts. A younger distributor may have a repeat customer, a signed order and only one year of…
- Dhaka airport and the difference between a terminal and a passenger journeyAn airport can look full on an annual chart and feel empty between two banks of departures. JICA’s account of Dhaka’s airport expansion cites about…
- Should a fisheries project reward a larger catch?A better landing site can raise a fisher’s income without requiring a larger catch. Fish handled quickly and hygienically may fetch a higher price…
- When does a dairy matching grant buy an investment that would never happen?A dairy cooperative that already planned to purchase a chiller will be delighted to receive a grant. The member farmers may gain very little…
- How many minutes does a Dhaka metro passenger really save?A fast train can be slow transport for someone who spends most of the journey reaching the platform. When Dhaka inaugurated its first electric urban…
- Dhaka can build a treatment plant. Will the sewage reach it?Treatment capacity has little value if the wastewater never arrives. In March 2020 the World Bank approved US$170 million to improve sanitation…
- Dhaka’s water districts made a missing litre easier to findA utility can pump more water and still bill for the same volume. Dhaka WASA’s district metered areas made it possible to ask a smaller, answerable…
- The return on a grain silo depends on what comes back outA tonne of grain in a government ledger is not necessarily a tonne that can be released in saleable condition when prices rise. Bangladesh’s Modern…
- At Sonagazi, cheaper panels changed the question for the lenderA fall in equipment prices can create an awkward decision for a borrower. Should it install the original plant more cheaply, or use part of the…
- A public-works wage has to arrive during the lean seasonA family short of cash between harvests may borrow to buy food this week. An employment programme that pays generously after the harvest can be less…
- Two loans and two ways to test a green factory claimA lender can ask where its money went or whether a borrower’s performance improved. IFC’s June 2024 package for EPIC Group puts both questions on the…
- A floating LNG terminal buys Bangladesh access to a marketA floating terminal can turn a cargo of liquefied natural gas into pipeline supply. It cannot guarantee the buyer an affordable cargo. At…
- How much new foreign exchange does a remittance bonus buy?A policy can increase the remittances recorded by banks even if families abroad send exactly the same amount of money home. Bangladesh introduced a…
- Grameen Danone and the cost of the last pot of yogurtAn affordable pot of fortified yogurt creates no nutritional benefit for a child if it spoils on a seller’s route or is purchased only once. Grameen…
- What changed when Grameenphone changed the face value of a share?A shareholder can cut a cake into ten pieces or a hundred without changing the size of the cake. The harder part of Grameenphone’s 2009 offer was…
- Hamza Textiles and the cost of getting a colour right the first timeA buyer can reject an entire batch of cloth because the shade is wrong. The mill has already paid for the water, heat, dyes and machine hours.…
- Why a Bangladeshi farmer might buy water instead of a solar pumpA small farmer needs water during a particular week. Owning a pump that can run for years may be a much less attractive purchase. IDCOL’s solar…
- What happens to an island mini-grid when the national grid arrives?An island power operator can spend years building a customer base and lose its most valuable customers when a subsidised national network arrives.…
- Why would a finance company buy government paper?A treasury bill and a small-business loan compete for the same taka on a finance company’s balance sheet. Only one is likely to be easy to sell at…
- How IDCOL sold rural lighting one instalment at a timeA solar panel sold with no service agreement is an appliance. A panel sold on instalments with local repair support is also a credit product and a…
- Who decides whether an industrial machine really saves energy?A manufacturer looking at an efficient machine sees a supplier quote and an electricity bill. A public lender sees an additional problem. Would the…
- A cyclone shelter has to earn its place on an ordinary school dayA shelter built for a rare but catastrophic event can stand empty for long periods. A school is used on ordinary days but needs to switch function at…
- Which rural bridge should Bangladesh repair first?Two rural bridges with similar cracks can deserve very different places in a maintenance queue. One has a nearby alternative crossing. A closure at…
- Can a shared testing service help Bangladeshi firms win a second export order?For a small manufacturer the difference between a promising sample and a repeat export order may be a testing certificate, a predictable lead time or…
- Can better dispatch save fuel without building a power station?Two plants can produce the same electricity at different costs. If a lower-cost plant is available and the network can carry its output, a change in…
- What Bangladesh bought when it doubled a power interconnectionA border interconnector gives a power buyer access to sellers on the other side. It does not put a single unit of electricity under contract.…
- Who takes the risk on PRAN Agro’s guaranteed bond?The institution that buys a corporate bond does not always take the principal risk on the company that issued it. In 2021 GuarantCo supported a BDT…
- PRAN can buy a bigger line. Can it keep the line supplied?A milk processor can buy extra filling capacity on a fixed delivery date. It cannot order a village’s milk supply to rise on the same date. IFC’s…
- When a compensation fund knows the claims before it has the cashA family that has lost its main earner faces rent and food bills while a compensation claim is being assessed. Its financial problem starts…
- RCBC and the Bangladesh Bank heist: how US$81 million vanished through a Manila branchIn February 2016 hackers tried to steal almost US$1 billion from Bangladesh’s central bank account at the New York Fed. US$81 million got through…
- Robi bought a wider network. Which sites could it actually close?On a map, two masts in the same neighbourhood look like duplication. At six in the evening they may both be carrying essential traffic. That…
- When rain falls at the weather station but misses the farmA farmer can lose a harvest while a nearby weather station records enough rain to prevent an insurance payout. An insurer can also pay a farmer whose…
- Textown turned a water saving into a production decisionAn engineer can measure litres at a dyeing machine. A finance director needs to know which of those litres ever showed up as a cost and what it would…