Skip to content
All case studies
Case study · BrazilAviation and capital markets2022Last reviewed 22 November 2026

Brazil case studiesAmericas case studies

Embraer and Eve

How much runway did Eve’s stock-market debut buy?

An aircraft programme can run out of money long before anyone learns whether passengers will buy tickets. When Embraer brought Eve to market through Zanite, the immediate achievement was financing an experiment. A stock exchange listing made the experiment visible. It did little to establish the cost of certifying an aircraft, the revenue per flight or the length of time investors would have to wait for either number.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

Closing capital contributionUS$377m
Total external contributionUS$192m
Embraer contributionUS$185m
01 · The situation

What happened

Embraer’s accounts date completion to 9 May 2022. They attribute US$377 million of capital to three sources. Only US$19.7 million came from Zanite’s trust. Outside private-placement investors provided US$172.3 million, while Embraer itself contributed US$185 million. The filing also describes restrictions on using Eve’s money for unrelated subsidiaries. A group presentation could therefore show more consolidated cash without giving the parent equivalent freedom to spend it.

A development director needs engineering teams to stay together between tests. A finance director needs the freedom to stop committing money if a test exposes a fundamental problem. Delaying a decision can destroy both kinds of value. Suppliers reserve people and tooling before a design is final. Premature commitments make revisions expensive, while late orders can leave an otherwise viable aircraft waiting for parts. The value of a funding round lies partly in which commitments it allows management to defer.

Investors should separate three milestones. A successful engineering demonstration establishes that something can work under test conditions. Certification requires evidence acceptable to the relevant authorities. A profitable service additionally requires customers, usable landing sites and enough flights to spread overhead. A cheque written at closing provides time to approach those milestones. It supplies no evidence that the last milestone follows automatically from the first.

Eve is Embraer’s electric vertical take-off and landing, or eVTOL, business, developing a small electric aircraft for short urban flights. Embraer chose to list it through a merger with Zanite Acquisition Corp., a special purpose acquisition company, or SPAC, rather than a traditional initial public offering. The deal was agreed in December 2021, approved by Zanite shareholders on 6 May 2022 and completed on 9 May.

Eve’s filings report gross proceeds of US$377.0 million and net proceeds of US$329.1 million after costs. Most of Zanite’s public shareholders chose to redeem their shares for cash, leaving only US$19.7 million from the SPAC trust. That pattern was common in 2022, when many SPAC investors took their money back rather than stay invested in pre-revenue companies.

For readers anywhere, the lesson is that a listing is not the same as a large public fundraising. Look at who actually supplied the money, what it may be used for, and how long it will last before the next round is needed.

02 · Timeline

Key moments

  1. Eve’s business combination with Zanite closes.

  2. The financing includes trust cash, third-party private-placement funds and an Embraer contribution.

03 · Exhibit
Exhibit 1 · Where Eve’s US$377m came from at listing
US$ million185.0Embraer contribution172.3Private placement investors19.7Zanite trust (after redemptions)

Gross proceeds were US$377.0m; net proceeds after costs were US$329.1m. Shares began trading on the NYSE as EVEX on 10 May 2022. Source: Eve Holding SEC filings.

04 · Core tensions

The trade-offs at the heart of the case

The cash outside the parent’s reach

It is worth looking at the transaction from the parent company’s treasury desk. Someone who sees US$377 million appear in a consolidated cash discussion might imagine that the group has exactly that much more protection against a downturn in its other aircraft businesses. Embraer’s own contribution moved resources between parts of the group. Only the external contribution brought new money from outside, and the protective terms ring-fenced access to the investee’s cash. Three views of one bank balance can therefore be correct at once. Eve can budget against its funds, Embraer can consolidate a controlled business, and a creditor elsewhere in the group can still have limited access to that money. Consider a proposed supplier agreement with a modest deposit and a much larger payment when a design is frozen. If signing now secures a scarce engineering team, part of the deposit resembles an option premium. If technical changes require the entire tooling package to be replaced, the later payment may become an expensive commitment to an early design. The board needs the cancellation terms, ownership of the engineering work and the cost of waiting. A round of funding does not make every supplier contract equally affordable just because all of the deposits fit in the initial budget. A production forecast introduces another trap. Interest from operators is useful evidence of how an aircraft might be used. A customer willing to reserve capacity on generous cancellation terms has made a much smaller commitment than a customer supplying a nonrefundable deposit under a binding purchase agreement. Build a ladder of evidence from conversations to contracted receipts and attach separate probabilities to certification, customer acceptance and delivery. One broad probability of commercial success hides which piece of information would justify the next expenditure.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    Which closing contributions increased consolidated group liquidity, and which increased Eve’s spending capacity?

  2. Q2

    What supplier commitment would you authorise before certification, and what cancellation rights would you require?

  3. Q3

    How would you distinguish a customer expression of interest from financeable demand?

  4. Q4

    How would you verify cash available to Eve itself using information available at the time?

  5. Q5

    Which finding about certification work and supplier commitments would most change your recommendation, and why?

Frameworks worth applying
  • SPAC listings
  • Development-stage finance
  • Parent–subsidiary cash
  • Real options
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

A useful board report would reconcile external funds, internal contributions and cash restrictions before discussing flight milestones. Each audience could then see which resources it could actually rely on. Release discretionary expansion spending against documented design and testing progress. Protect the team that creates the evidence, and maintain a cash reserve for redesign. The strongest objection is that suppliers may reserve scarce capacity for a rival. A refundable reservation or a small tooling commitment can buy time while leaving the most expensive production decisions open.

  1. Separate group and project cash

    Report clearly which funds belong to Eve and cannot be used elsewhere in Embraer.

  2. Stage commitments

    Release supplier and tooling spending as certification milestones are met.

  3. Raise before the clock runs down

    Start the next funding round well before cash falls to a critical level.

What this plan gives up

Listing Eve brought in outside money and a market value for the project, but most of the cash came from Embraer itself and from a few placement investors, while redemptions left little from public SPAC holders.

The strongest counter-argument

For the next financing decision, set two clocks running side by side. The engineering clock tracks when the next test can produce information valuable enough to change the design. The treasury clock tracks when a new round must start in order to close before funds run low. Beginning negotiations with substantial cash left may look premature, but waiting for the final test result can leave the company bargaining from a position of weakness. The cost of early dilution is therefore best compared with the cost of approaching investors with too little time. Consider what an investor would need to approve a bridge after an unsuccessful test. A documented cause, a priced remedy and an independent schedule can make a setback financeable. A declaration that the technology remains promising supplies much less information. Set aside the question of whether the market eventually became enthusiastic about electric aviation. The decision in 2022 was which programme commitments closing capital could responsibly support before certification and commercial demand had been established.

Metrics to watch

  • Eve cash balance and burn
  • Certification milestones
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.