Hitachi and ABB

Buying a power-grid business in two stages

A grid project may run for years after two industrial groups agree to separate. Hitachi acquired control of ABB’s power-grid operation first and the remaining stake later. What can a staged acquisition accomplish that a single payment cannot?

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

First stake80.1%
Remaining stake19.9%
Enterprise value (100%)$11bn
Call option value for 19.9%$1.679bn
01 · The situation

What happened

For a customer commissioning a transformer or a substation, the identity of the shareholder matters less than the continuity of warranties, service and engineering. A carve-out transfers a business from systems and relationships inside one company to another. Some dependencies are obvious, such as a factory. Others surface only when an old product needs a spare part or a previously shared system must be renewed.

Hitachi took an 80.1% stake in 2020. ABB retained 19.9%, and Hitachi later bought it through a call option with an exercise value of $1.679 billion. Applying that final payment mechanically to the entire business would ignore the option terms, intervening performance and the difference between selling control and disposing of the residual interest. The arrangement divided the transition into two separate decisions.

An inherited backlog has a further complication. A large contract can look attractive at its original margin and lose money after component prices rise or completion slips. Ownership of a pipeline of orders means accepting the remaining cost of delivery as well as the right to bill. A backlog total without a completion-cost estimate has limited value to the purchaser.

A long-running equipment business can inherit commitments made by engineers who have since moved to different teams. The records needed to service an installation may sit with the selling company even after legal title transfers. A utility needing an urgent replacement will judge Hitachi on whether a technician can interpret those records. The practical completion of a carve-out therefore lies in a repeatable service process as much as a signed ownership document.

Ask the new company to resolve one real customer service request using only the systems, technical documents and people it will retain after transition. A response still dependent on the seller exposes unfinished separation work. That discovery can justify extending a specific support service while ending others on time, which is more defensible than delaying every part of the integration.

The question for investors was whether Hitachi could earn more from the grid business than ABB had.

The two-stage structure is common when a seller wants to exit a business gradually. It lets the buyer learn the business before taking full ownership, but the price of the second stage depends on agreed formulas or market values, which may move. Students should compare the price per percentage point paid in each stage and ask what had changed in between.

For Hitachi, the deal was part of a wider reshaping of its portfolio towards energy, digital services and infrastructure, while it sold listed subsidiaries in other industries.

Hitachi announced the deal in December 2018 and completed the first stage on 1 July 2020, paying about $6.85 billion for 80.1% of ABB’s power grids business. The figure came after deducting debt and other items from an enterprise value of $11 billion for the whole business, which had about 36,000 employees in some 90 countries and annual revenue of around $10 billion.

ABB kept 19.9% with the right to sell it after three years at fair market value, subject to a floor of 90% of the enterprise value. Hitachi had a matching option to buy. When Hitachi exercised its call option, the exercise value was $1.679 billion, and the business, renamed Hitachi Energy, became wholly owned. Buying in two stages let Hitachi gain control at once while keeping ABB involved during the transition, and gave ABB cash to return to its shareholders.

02 · Timeline

Key moments

  1. Hitachi and ABB sign an agreement with a route to full ownership.

  2. Hitachi takes control of the power grids joint venture.

  3. ABB completes the sale of its remaining interest after Hitachi exercises its option.

03 · Exhibit
Exhibit 1 · What Hitachi paid in two stages
US$ billion6.8580.1% stake (2020)1.68Remaining 19.9% (call option)

The 80.1% price is after deducting debt and other items from the $11bn enterprise value. Sources: Hitachi (July 2020); ABB.

04 · Core tensions

The trade-offs at the heart of the case

Orders and obligations

Every unfilled project brings revenue to collect and work left to do, including obligations that may become harder to meet after a carve-out.

Transitional dependence

Retaining seller support reduces immediate execution risk while postponing the day on which the new owner knows it can operate independently.

Future bargaining

A pre-agreed call can reduce uncertainty over control while limiting the parties’ ability to renegotiate in light of information learned during integration.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    What did ABB’s residual ownership achieve that a transitional consulting contract might not have achieved?

  2. Q2

    How would you value the last 19.9% if project cost estimates had changed since Hitachi first obtained control?

  3. Q3

    When would cash run short in the stress case, and which payment could realistically be deferred without damaging the business?

  4. Q4

    From the perspective of a utility waiting for a commissioned substation, what evidence would most seriously challenge the recommendation in this case?

  5. Q5

    Which of the three proposed metrics would you prioritise for Hitachi and ABB, and what could go wrong if management rewarded it in isolation?

Frameworks worth applying
  • Staged acquisitions
  • Option value
  • Carve-outs
  • Portfolio restructuring
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

Before releasing transition services, test whether the new group can deliver, commission and repair a representative installation independently. Review project margin at completion and customer acceptance. These tests give an option exercise committee better evidence than a rise in the face value of orders.

  1. Establish the baseline

    Review milestones accepted by utilities, remaining commissioning work and the cash attached to final acceptance. Check which party bears warranty and interface risk.

  2. Test the proposed change

    Run an end-to-end service test on an installed project before withdrawing the seller’s engineering or systems support.

  3. Set a condition for reconsidering

    Retain specialist support where unresolved acceptance tests or incomplete documentation put final payment at risk.

What this plan gives up

Keeping transition services in place ties up both companies’ specialists and delays administrative savings.

The strongest counter-argument

Moving responsibility rapidly to one owner can end duplicated decisions and give customers a single accountable service provider.

Metrics to watch

  • Revised margin on unfinished contracts
  • Warranty resolution times
  • Transition services successfully retired
  • Grid order backlog
  • Margin of the energy business
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.