What happened
In the 3.7 and 4.5 GHz ranges, DOCOMO and the KDDI/Okinawa Cellular group received 200 MHz each in total, while SoftBank and Rakuten received 100 MHz each. All four received 400 MHz in the 28 GHz range. These are bandwidth assignments in different frequency ranges. Adding all the megahertz together conceals differences in coverage and deployment cost.
A higher-frequency site can deliver substantial capacity over a limited area. Whether that is valuable depends on demand at the particular location, the sites available and the cost of connecting them. A dense business district may justify capacity that would go largely unused in a sparsely populated area. A national coverage measure and a busy-hour capacity measure answer different policy questions.
An established operator can reuse parts of an existing network, while an entrant may need sites, customers and finance at the same time. Assigning equal high-band bandwidth creates equal rights in that band, not equal costs of using them. Conversely, an entrant’s investment can improve competition even when the direct financial return to its own shareholders looks uncertain.
The private operator and public allocator may value the same site for different reasons. A cell serving a commuter hub can earn attractive revenue and relieve congestion. A cell serving a sparsely populated route might improve the continuity of coverage without generating enough incremental revenue to pay for itself. A rollout condition can make the latter investment happen, but its cost still needs financing. If that cost is hidden, competing deployment promises may look more credible than they are.
An entrant also faces a timing problem. Customers want a useful network before they subscribe, while lenders want evidence of demand before financing extensive deployment. Sharing some infrastructure can reduce that gap while preserving competition over service and pricing. The relevant policy question is which shared inputs lower duplicated cost and which would remove a reason for operators to improve service independently. Spectrum ownership is only one part of that design, alongside site access, backhaul, device support and enforceable rollout commitments.
For each proposed deployment area, identify the resource that prevents the next paying customer from receiving acceptable service at the busy hour. It may be spectrum, site access, backhaul or device availability. The answer tells the operator whether investment in a new radio site solves the real problem and tells the public authority whether the rollout promise is meaningful.
On 10 April 2019 Japan’s Ministry of Internal Affairs and Communications assigned 5G spectrum to four carriers: NTT Docomo, KDDI, SoftBank and the new entrant Rakuten Mobile. Each received 400 MHz in the 28 GHz band. In the 3.7 and 4.5 GHz bands, Docomo and KDDI received two 100 MHz blocks each, while SoftBank and Rakuten received one each.
Japan did not auction the spectrum. Instead it used a comparative review, scoring each carrier’s plans for coverage, base stations, investment and finances, and letting the highest scorers choose first. Docomo ranked first, followed by KDDI, Rakuten and SoftBank. The carriers pledged combined investment of about $14.6 billion, with Docomo planning about $7 billion and promising 97% population coverage within five years.
Most countries auction spectrum, which raises money for governments and lets the market set a price. Japan’s approach charged no auction fees but tied licences to building commitments. Supporters argue this pushes money into networks rather than into government budgets; critics say it gives regulators too much discretion and may favour incumbents. The case also highlights the economics of telecoms: high-frequency 5G carries a lot of data but over short distances, so it needs many more sites, and returns depend on whether customers will pay more for faster service.
Key moments
Operators prepare plans for establishing 5G base stations.
The ministry assigns frequencies to four operator groups.
Operators face the separate task of funding deployment and bringing useful capacity to customers.
Pledged five-year population coverage: Docomo 97.0%, KDDI 93.2%, SoftBank 64.0%, Rakuten 56.1%. Sources: 5G Observatory; BCN.
The trade-offs at the heart of the case
Coverage and capacity
A deployment reaching many geographical areas can leave a crowded station short of throughput, while a fast urban network can leave gaps between cities.
Equal bandwidth
Identical spectrum rights do not equalise costs for operators with different site networks, backhaul arrangements, financing and existing customer bases.
Public value
A site can improve regional continuity while generating little incremental operator revenue, raising a practical question about how ambitious rollout obligations will be financed.
For your seminar, paper or interview
- Q1
Why should a policymaker avoid treating 100 MHz at mid-band as interchangeable with 100 MHz at 28 GHz?
- Q2
How would you compare an entrant’s rollout promise with an incumbent’s existing infrastructure advantage?
- Q3
Which resource limits output in the exhibit, and what is the least costly way to serve the next unit of demand?
- Q4
From the perspective of a mobile subscriber outside a dense city centre, what evidence would most seriously challenge the recommendation in this case?
- Q5
Which of the three proposed metrics would you prioritise for Japan’s Ministry of Internal Affairs and Communications, and what could go wrong if management rewarded it in isolation?
- Spectrum allocation
- Beauty contests versus auctions
- Network economics
- Competition policy
How we would approach it
Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.
Evaluate deployment proposals on usable service by location, coverage over time and the cost of meeting commitments. Publish measures that can distinguish nominal availability from a network customers can use reliably at busy times. Allow the economics of coverage and capacity to be assessed separately.
Establish the baseline
Measure geographic coverage, busy-hour performance and service continuity along representative routes. Map these against backhaul and site cost.
Test the proposed change
Compare a dense capacity deployment with a broader coverage deployment at equivalent total cost using customers’ actual travel patterns.
Set a condition for reconsidering
Refocus expansion where new spectrum is available but inadequate backhaul or a lack of compatible devices prevents usable service.
What this plan gives up
Detailed rollout reporting can favour large incumbents able to support compliance teams and finance early deployment.
The strongest counter-argument
Simple comparable obligations can give an entrant a clearer path to market and deter incumbents from warehousing scarce spectrum.
Metrics to watch
- Busy-hour throughput at representative sites
- Coverage achieved against rollout plans
- Capital and operating cost per active customer
- 5G base stations built versus plans
- Carriers’ return on capital
Propose your solution
Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.
Published solutions
Loading published solutions…
- ITU Association of Japan summary of assignments ↗
- MM Research Institute coverage of the four awards ↗
- Industry account of approved deployment plans ↗
- Rakuten announcement of approval of its deployment plan ↗
- 5G Observatory: Japan assigns 5G spectrum ↗
- KDDI Annual Report 2019 (5G rollout plan) ↗
- Photo: NTT DoCoMo Yoyogi Building 2009 cropped.jpg by NTT_DoCoMo_Yoyogi_Building_2009.jpg: Wiiii derivative work: 0607crp (talk), CC BY-SA 3.0 (cropped and resized) ↗
Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.





