Case study · BangladeshResilience and public services2014 project designLast reviewed 22 November 2026

Bangladesh case studiesAsia-Pacific case studies

Local Government Engineering Department

A cyclone shelter has to earn its place on an ordinary school day

A shelter built for a rare but catastrophic event can stand empty for long periods. A school is used on ordinary days but needs to switch function at short notice when a cyclone approaches. Bangladesh’s Multipurpose Disaster Shelter Project combined those uses. The World Bank’s 2014 appraisal set out a US$375 million equivalent credit, while its project profile identifies nine coastal districts. The investment decision was as much about access and management as concrete floor space.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

Multipurpose Disaster Shelter Project approved2014
IDA commitment at appraisalUS$375 million
Geographic scope in the project profile9 coastal districts
01 · The situation

What happened

A planner can draw a circle around each building and count people living inside it. During an emergency, travel follows actual paths, some of which become impassable before the shelter itself is at risk. Families may delay departure if they cannot bring dependants or protect essential assets. Capacity calculated from floor area can therefore exceed capacity that residents can safely reach and use. An additional shelter place is valuable only together with a credible route and functioning local arrangements.

Daily school use gives the building a constituency that notices broken doors, poor water provision and inadequate maintenance. Dual use can also create conflicts. Storing emergency supplies occupies teaching space and an evacuation can interrupt classes. A budget should recognise both functions and identify who pays for restoring the school after an event. Treating education benefits as a free bonus while giving the school no maintenance allocation makes the financial case look better than the operating arrangement.

When two candidate sites compete, compare households newly within a safe travel time, access for people with mobility constraints and school demand on ordinary days. A drill can reveal a missing key or an approach road that an engineering inspection overlooks. It cannot reproduce conditions in every storm, so combine the evidence with local knowledge and contingency arrangements. Expanding a network of reachable shelters may create greater protection than expanding one impressive building in the most visible location.

The World Bank approved the Multipurpose Disaster Shelter Project on 16 December 2014 with a US$375 million IDA credit, and the financing agreement was signed in January 2015. The Local Government Engineering Department was the implementing agency.

The project planned to build 552 new multipurpose shelters, rehabilitate about 450 existing ones and build more than 550 kilometres of access roads in nine coastal districts. The World Bank said it would improve access to safe havens for nearly 14 million people. It was the first time steel shelter designs were introduced in Bangladesh.

The project built on earlier experience, especially the Emergency 2007 Cyclone Recovery and Restoration Project that followed Cyclone Sidr. The World Bank describes it alongside the Coastal Embankment Improvement Project as a complementary part of its coastal resilience support.

Disaster infrastructure has an unusual financial profile: its benefits are the losses that do not happen. That makes it hard to value and easy to neglect in budgets. Countries that have reduced cyclone deaths sharply, including Bangladesh, have combined warnings, shelters and community preparedness. For any public investor, the lesson is to fund running costs as well as construction, because an unmaintained shelter can fail exactly when it is needed. For donors and governments, a simple test of success is whether shelters are full and functioning during the next cyclone warning. That one observation shows whether design, location, maintenance and community trust have all come together, which no construction report can capture on its own. Regular drills before the cyclone season help build that trust.

02 · Timeline

Key moments

  1. The Bank prepared the appraisal and approved the multipurpose shelter operation.

  2. LGED’s delivery remit and the coastal districts were set out in the country portfolio.

03 · Exhibit
Exhibit 1 · Bangladesh: Rural population share
% of population74.1200672.3201070.82014

Source: World Bank, World Development Indicators (SP.RUR.TOTL.ZS).

04 · Core tensions

The trade-offs at the heart of the case

Walk the route before approving the building

A site visit should begin at the household furthest from the proposed entrance. Ask a local school representative and a resident with limited mobility to describe the route, the point at which it becomes impassable and the means of receiving a warning. Record costs that fall between agencies, such as clearing the approach and restoring water after an emergency. I would prioritise a site where ordinary school use supports regular maintenance and where alternative access remains feasible. The exercise below prices routine travel improvements only. The severe-event protection deserves a separate evaluation, including lives and livelihoods at risk, rather than an arbitrary monetary add-on.

Protection depends on a sequence of decisions

An embankment and a shelter protect people in different parts of a severe event. A successful embankment can reduce the frequency of damaging water entry. A reachable shelter can protect people when a defence is exceeded or conditions elsewhere become unsafe. Valuing them as substitutes in every scenario would neglect that complementarity. Valuing both as though each independently prevented all losses would double-count it. Map a small set of event scenarios, specify who evacuates under each and record what assets remain exposed. The result might favour a modest access improvement at a school alongside targeted embankment repair. Neither structure’s gross capacity tells the planner how the two will work together on the day that tests them.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    How should a planner measure effective shelter capacity?

  2. Q2

    Which budget should pay to restore classrooms after evacuation?

  3. Q3

    When would an approach road outperform adding floor space?

Frameworks worth applying
  • Disaster risk reduction
  • Multipurpose assets
  • Maintenance funding
  • Avoided losses
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

We think the shelters’ everyday use as schools is what makes them good value. A building used only during cyclones risks neglect between storms; one that serves pupils every day is more likely to be maintained, known to the community and ready when a warning comes.

  1. Fund maintenance explicitly

    Set aside an annual budget for each shelter so it stays usable.

  2. Assign clear owners

    Make school committees and local governments jointly responsible for upkeep.

  3. Test evacuation routes

    Check that roads and paths to shelters stay passable in heavy rain.

What this plan gives up

Designing buildings for both school and shelter use raises construction costs compared with a simple classroom.

The strongest counter-argument

Some argue money would save more lives if spent on early warnings, evacuation support and stronger homes, rather than on a limited number of large shelters.

Metrics to watch

  • Share of shelters rated in good condition
  • People evacuated per cyclone warning
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.