RenovAr and FODER

What did Argentina’s renewable-energy guarantee actually cover?

A public guarantee helped renewable projects raise finance by addressing a defined payment risk. The definition mattered more than its headline size.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

World Bank guarantee envelopeUS$480m
Projects requesting cover27
Maximum term20 years
Wind projects in group12
01 · The situation

What happened

Argentina’s renewable auctions offered developers contracts to sell power. Lenders still had to ask what would happen if a project encountered a qualifying contractual or policy event. The guarantee structure involved FODER and, under specified circumstances, a right to sell a project. The World Bank provided partial cover for certain obligations. This was a method of reallocating a defined risk. It did not exempt a developer from building the plant or producing electricity when the resource was available.

The early group comprised twelve wind, ten solar, four small hydro and one biogas project, adding to twenty-seven. The government reported up to twenty years of cover per participating project. Dividing the US$480 million envelope equally would imply about US$17.8 million each, but the mix of sizes makes that an arithmetic average rather than an allocation in the contracts.

In 2016 Argentina launched RenovAr, a programme of auctions for long-term contracts to sell renewable power to the state wholesale market operator. Investors saw high country risk after years of default and capital controls, so the government created a trust fund, FODER, to guarantee payments, and the World Bank Group helped prepare the tenders and provided a guarantee.

Round 1, in 2016, awarded 1,142 MW at an average price of 6.13 US cents per kWh, below the 2015 average generation price of 7.05 cents. Most was wind (707 MW) and solar (400 MW). Round 1.5, in November 2016, awarded 30 projects totalling 1,281 MW at even lower prices: 5.33 cents for wind and 5.44 cents for solar.

In 2017 the World Bank approved a 20-year, US$480 million guarantee for FODER. Of the 59 projects awarded in Rounds 1 and 1.5, 27 requested it: 12 wind projects (721 MW), 10 solar (306 MW), four small hydro and one biogas. The Green Climate Fund also approved a US$130 million loan for RenovAr projects.

The case shows how public guarantees can cut the cost of capital for private projects, and why the exact trigger for a guarantee matters.

In Round 1, 15 of 29 awarded projects requested the guarantee, for US$295 million in total cover, a sign of how much investors valued protection against sovereign payment risk.

02 · Timeline

Key moments

  1. The World Bank approves a guarantee envelope for RenovAr rounds 1 and 1.5.

  2. An indemnity agreement is authorised by decree.

  3. Guarantee arrangements take effect for participating projects.

03 · Exhibit
Exhibit 1 · RenovAr auction prices fell between rounds
US$ per MWh (average awarded)59.4Wind, Round 153.3Wind, Round 1.559.7Solar, Round 154.4Solar, Round 1.5

Round 1 awarded 1,142 MW at an average 61.3 US$/MWh; Round 1.5 awarded 30 projects and 1,281 MW. The World Bank guarantee was US$480m over 20 years. Source: MIGA/World Bank Group case study.

04 · Core tensions

The trade-offs at the heart of the case

Core tensions

A guarantee can lower financing costs even if it never pays out. It can also create incentives to bid aggressively and leave taxpayers with exposure if triggers are poorly drafted. Lenders should distinguish ordinary weather and construction risks from qualifying events linked to public counterparties. Pricing every bad outcome as insured would hide weaknesses in an otherwise uneconomic bid. A smaller guarantee could still attract lenders if it covers the specific public-sector risks they cannot price. Extending protection to routine operating losses could instead weaken incentives to assess engineering and resource quality. Compare the incremental financing benefit with the extra public exposure.

Testing the evidence

The appropriate unit of observation is one guaranteed renewable project. Track financing cost after guarantee fees and residual risks and record the baseline before the decision. The most useful records are guarantee schedules, bid prices and financing commitments. Align their dates and definitions before drawing an inference. In particular, allow for stronger sponsors selecting into guaranteed projects. A change in that factor can move the reported outcome even when the intervention has had no effect. Compare borrowing margins for otherwise similar projects with and without cover, after including fees. The most cautious or most exposed sponsors may be the ones selecting protection. Their higher initial risk can make a beneficial guarantee look ineffective in an uncontrolled comparison.

A related Argentine case

Cauchari’s buyer credit financed procurement through a borrower-lender relationship. RenovAr’s guarantee addressed a contingent payment risk. Adding the guarantee amount to funded project loans would combine two different types of public exposure.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    What failure could bankrupt a renewable project while leaving the public guarantee entirely untouched?

  2. Q2

    How would you measure financing cost after guarantee fees and residual risks for one guaranteed renewable project using the available records?

  3. Q3

    Which assumption in “Valuing a narrowly triggered guarantee” would you challenge first, and how would changing it affect the decision?

  4. Q4

    Could stronger sponsors selecting into guaranteed projects explain the observed change? What evidence would distinguish that explanation?

  5. Q5

    Under what conditions would you prefer offering narrower cover targeted to the most expensive public risk, and who would bear the residual risk?

Frameworks worth applying
  • Renewable auctions
  • Partial risk guarantees
  • Sovereign payment risk
  • Blended finance
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

Publish the trigger, waiting period, beneficiary and coverage limit in a compact summary for each project. Compare financing terms with similar uncovered projects, adjusting for size and technology. Evaluate public value through projects that become viable and the contingent liabilities accepted to achieve them.

  1. Run competitive auctions

    Award long-term power contracts to the lowest bidders.

  2. Back payments with a fund

    Use FODER to guarantee the state buyer’s payments.

  3. Add a World Bank guarantee

    Let projects buy cover against specific government failures.

What this plan gives up

Guarantees lowered financing costs and prices, but they protect only against specific public failures, not against weak wind or poor project management.

The strongest counter-argument

For the public guarantee administrator, the alternative worth costing is offering narrower cover targeted to the most expensive public risk. Give both choices the same information date. Specify what can still be reversed, who absorbs the cost if the forecast is wrong, and the point at which new evidence would justify changing course. Make the decision conditional on an observable change in financing cost after guarantee fees and residual risks. That condition lets someone outside the original decision team distinguish a sensible revision of the plan from an attempt to explain away poor results.

Metrics to watch

  • Payment record of CAMMESA
  • New renewable capacity additions
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.