Skip to content
All case studies
Case study · SingaporeEngineering consultancy2016Last reviewed 22 November 2026

Singapore case studiesAsia-Pacific case studies

Surbana Jurong

Buying SMEC when the most valuable assets can resign

Buying an engineering consultancy means acquiring contracts and an organisation full of people who can leave. Singapore’s Surbana Jurong paid approximately S$400 million for Australia’s SMEC in 2016. The transaction tested whether complementary engineering capabilities would translate into work the combined firm could win and deliver.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

BuyerSurbana Jurong
TargetSMEC
Interest acquired100%
Announced priceAbout S$400m
01 · The situation

What happened

SMEC brought a history in infrastructure engineering associated with Australia’s Snowy Mountains Scheme. Surbana Jurong brought urban development and planning capabilities. A client requiring both master planning and transport engineering might prefer one accountable team. Equally, a client may deliberately appoint separate advisers to obtain independent scrutiny. A wider menu of services does not guarantee larger awards.

The announced combination brought the combined workforce to almost ten thousand people. Headcount indicates scale but says little about whether the acquired engineers practise where the buyer needs them, hold the relevant registrations or have time available when a client wants a project delivered. Work in different countries can diversify demand while making supervision, currency management and local professional obligations more complicated.

A consulting backlog is a promise of future work subject to staffing, scope and contract terms. A fixed-price design assignment can consume extra unbillable hours if a site proves more complicated than the proposal allowed. A scarce project director assigned to a joint bid cannot spend the same week on an existing client’s project. The opportunity cost can exceed the apparent salary expense.

A joint bid creates another governance question if something goes wrong. One team may promise a fixed delivery schedule relying on work performed by another unit in another jurisdiction. Cost overruns can then be pushed between profit centres, leaving no one accountable for the original estimate. Agree who signs off technical scope, who prices contingency and who decides to stop bidding before the attraction of headline contract value takes over.

SMEC continued to operate under its own name within the group, which helped keep client relationships and staff identity intact.

On 1 August 2016 Surbana Jurong, a Singapore urban planning and engineering consultancy owned by Temasek, agreed to buy 100% of Australia’s SMEC Holdings for about S$400 million. SMEC began as the Snowy Mountains Engineering Corporation, created by the Australian government, and became known for infrastructure such as dams, transport and energy projects.

The companies said the combined group would have almost 10,000 employees in over 95 offices across about 40 countries, with revenue of about S$1.1 billion. Surbana Jurong itself was formed in 2015 from a merger, and before then Surbana had about 3,200 staff and annual turnover of about S$400 million. By 2017, after further deals, the group had about 13,000 staff and turnover of around S$1.3 billion.

In the same month as the deal, SMEC was named in reports of alleged bribery connected to contracts in Sri Lanka and Bangladesh. These issues show why due diligence in consulting acquisitions must cover conduct and compliance as well as finances.

Professional services deals differ from industrial ones because the main assets are engineers and client relationships, not machinery. Buyers usually pay for future earnings that depend on people staying. The case shows the importance of retention plans, careful integration and clear values when a firm grows rapidly through acquisitions.

02 · Timeline

Key moments

  1. The groups had built different geographic and engineering practices.

  2. Surbana Jurong announced its acquisition of the Australian consultancy.

03 · Exhibit
Exhibit 1 · Surbana Jurong before and after its acquisitions
S$ million annual revenue400Surbana before 2015 merger1,100Combined with SMEC (2016)1,300Group in 2017

Staff grew from about 3,200 before the 2015 merger to almost 10,000 with SMEC and about 13,000 by 2017. Sources: Enterprise Singapore; Reuters (via Investing.com); Business Times (via Yahoo).

04 · Core tensions

The trade-offs at the heart of the case

The engineer who appears in three proposals

Check whether a specialist promised to a prospective client is also named on other bids. It is easy to build a growth plan that sells the same senior engineer several times. Multiply expected assignments by timing and responsibility, then test feasible staffing in the scenario where several bids succeed together. Growth can dilute delivery quality precisely when sales teams report an excellent quarter. A consulting practice that wins a major project at an inadequate fee can be worse off than a practice that loses and preserves staff time. Reconstruct the expected margin in the original bid, then compare it with collections after design revisions and disputes. If a joint venture partner or local client controls an approval needed to bill, recognise the financing cost of delayed sign-off. The buyer’s claim to have added a prestigious project is a commercial achievement only to the extent the group can perform it well, collect its fee and still serve the clients that generated the original reputation.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    How much of a consultancy’s backlog can disappear when a leader leaves?

  2. Q2

    What cost is hidden when a director joins a speculative bid?

  3. Q3

    Which clients might prefer to keep two advisers independent?

  4. Q4

    How would you test whether bid teams pursuing only the easiest joint assignments explains the evidence?

  5. Q5

    Which observation would most change your estimate of the earnings supported by scarce expertise, and why?

Frameworks worth applying
  • Professional services M&A
  • People as assets
  • Geographic expansion
  • Retention
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

Retain the leaders who manage client relationships and measure delivery margins as well as bids won. Examine whether cross-border teams improve win rates after tender expenses. Compare joint proposals with comparable standalone bids and count losses too. A list containing only the firm’s most spectacular international wins will flatter the deal.

  1. Keep the brand

    Let SMEC trade under its own name so clients and staff see continuity.

  2. Tie leaders to results

    Use retention and incentive plans for senior engineers who manage client relationships.

  3. Bid jointly where it helps

    Offer combined planning and engineering only where clients want one team.

What this plan gives up

Buying SMEC gave Surbana Jurong global reach quickly, but in consulting the main assets are people who can leave, and the target’s past conduct becomes the buyer’s reputational risk.

The strongest counter-argument

Operating under one brand may help a client find complementary expertise but can also weaken recognition built over decades. Allow teams to explain what their clients buy from them before standardising pricing or identity. Technical review and professional accountability need explicit ownership when several units share a commission.

Metrics to watch

  • collected fees after actual delivery hours and write-offs
  • the earnings supported by scarce expertise
  • Staff turnover in acquired firms
  • Win rates on joint bids
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.