What happened
Track access, fleet readiness, staff training and a minimum timetable cannot all be cut in proportion to journeys lost. A train needed for a hospital shift may carry too few passengers to cover its direct cost and still fulfil an essential public purpose. Leaving an earlier revenue promise in place can produce expensive renegotiation while obscuring who ultimately funds the timetable.
Use a route contribution account with separate lines for ticket cash, expenditure avoided by reducing frequency and the costs that remain until longer-term contracts change. Include the cost of restoring a service later. Decisions based on allocated average cost can eliminate a train that saves little cash and carries passengers with few alternatives.
Select a lightly used early departure and identify the actual alternative available to its passengers. If a later train makes shift workers consistently late, the value of the service is poorly described by fare income. If a near-empty departure is closely followed by an equivalent train, the avoided cost of withdrawal may deserve more attention. Compare the alternatives without allocating all network overhead to the service that happens to be under review. Next ask how long it would take to reinstate the train and whether the relevant staff or access rights would still be available. A temporary reduction in service and permanent withdrawal are different financial decisions.
In October 2018 KeolisAmey, a joint venture between France’s Keolis and Britain’s Amey, began running the Wales and Borders rail franchise. It was the first franchise procured by the Welsh Government, through its company Transport for Wales, and came with promises of new trains and the South Wales Metro.
The pandemic destroyed the franchise’s economics, as passenger numbers fell dramatically. In October 2020 the Welsh Government announced it would bring operations under direct public control, and on 7 February 2021 TfW Rail Ltd, a subsidiary wholly owned by Transport for Wales, took over day-to-day services as operator of last resort. KeolisAmey stayed involved in upgrading the Core Valley Lines.
Running the railway publicly did not remove its costs. In 2023/24 the Welsh Government allocated about £245.8 million of revenue funding to TfW rail, and added £125 million during 2023 to cover pressures. For 2024/25 the rail allocation rose to £364.7 million. TfW said ticket sales rose 15% in 2023/24 as it worked to reduce reliance on subsidy. The case shows how a change of ownership shifts who bears revenue risk, while the underlying cost of trains, staff and track remains.
For a finance team, the key distinction is between costs that fall when fewer trains run and costs that stay fixed. Leases on new trains, depots, signalling charges and much of the workforce continue regardless of how many people travel, so a fall in passengers quickly turns a modest subsidy into a large one.
Public operation also changed incentives: managers no longer chase profit, so ministers must set clear targets for punctuality, costs and passenger growth.
Key moments
The Wales and Borders service operates under a franchise arrangement.
The Welsh Government announces a change of operator model.
Transport for Wales brings train operation into its public subsidiary.
TfW received an additional £125m for rail during 2023. Sources: Welsh Government funding letters; Senedd committee report (2024).
The trade-offs at the heart of the case
A comparison with InterCity East Coast: How a credible fallback changes negotiations
An operator unexpectedly leaving the East Coast franchise demonstrated the practical value of having alternative arrangements ready. The Welsh transfer followed a system-wide collapse in normal travel rather than simply a disappointing commercial bid. Both episodes reveal that the public authority remains the effective buyer of continuity when passengers cannot plausibly be left without a train. Think about what a substitute operator needs before it can make the first departure. It needs staff, access to trains and depots, a working timetable, safety responsibilities, customer information and a way to collect tickets. Every resource exclusively controlled by the outgoing provider raises transition cost and can increase its negotiating leverage. A public authority can preserve access through ownership, transferable contracts or conditions agreed well before financial distress. Each arrangement has a cost in tranquil times. Compare those costs with the value of being able to make a prompt, credible change under severe conditions. When demand recovers, the right allocation of commercial risk may change again. Preserving operational control during a crisis is therefore compatible with reconsidering the long-term delivery model on fresh evidence.
What to watch
Transport planners can preserve an option by retaining trains and staff during a temporary slump. The option has a carrying cost. Compare that cost with the time needed to recruit, retrain and remobilise once demand returns. Test corridors separately. A route serving universities or leisure destinations may recover on a different timetable from one dependent on five-day commuting. A single network-wide passenger percentage obscures the choices that affect both service quality and public funding.
For your seminar, paper or interview
- Q1
Which costs would actually disappear if one return service were withdrawn?
- Q2
How would you decide when private revenue risk became affordable again?
- Operator of last resort
- Fixed vs variable costs
- Revenue risk
- Public ownership
How we would approach it
Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.
Give the public operator a transparent service specification and report the subsidy required at several levels of demand. Protect essential connections and make the decision to increase frequency depend on observed load, journey purpose and the ability to operate reliably.
Take operations in-house
Move train services to the publicly owned TfW Rail from February 2021.
Keep the private partner for infrastructure
Retain KeolisAmey for the Core Valley Lines upgrade.
Rebuild revenue
Grow ticket sales to reduce subsidy after Covid.
What this plan gives up
Public operation kept trains running when fares collapsed, but it left the Welsh Government carrying the full cost of the railway, and subsidy needs grew as costs rose.
The strongest counter-argument
Public operation removes one commercial boundary and can weaken external challenge on costs. Independent benchmarking and open reporting are therefore especially important. A private management contract could still supply operating expertise while leaving the risk of a government-imposed restriction with the public authority.
Metrics to watch
- Ticket revenue growth
- Subsidy per passenger journey
Propose your solution
Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.
Published solutions
Loading published solutions…
- Welsh Government: Welsh rail franchise now in public ownership ↗
- Welsh Government: announcement and operating arrangements ↗
- National Audit Office: The InterCity East Coast passenger rail franchise ↗
- Senedd Research: The Welsh Government goes public on the future of Welsh rail ↗
- Welsh Government: Welsh rail franchise now in public ownership ↗
- Welsh Government: Financial support for TfW 2023 to 2024 ↗
- Welsh Government: TfW funding letter 2024-25 ↗
- Transport for Wales: Annual report 2023/24 ↗
- Image: AI-generated editorial illustration
Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.





