Skip to content
All case studies
Case study · ArgentinaInternational finance2018–2021 evaluationLast reviewed 22 November 2026

Argentina case studiesAmericas case studies

The 2018 IMF stand-by arrangement

Why a large financing envelope did not restore confidence

Funding on paper could bridge a temporary shortage. It could not guarantee that private investors would refinance maturing claims.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

Augmented access≈US$57bn
Share of IMF quota1,227%
Reviews completed4 of 12
Cancellation24 July 2020
01 · The situation

What happened

The IMF’s retrospective assessment concluded that the programme had not restored confidence in fiscal and external viability while supporting growth. That conclusion changes how one should read the headline US$57 billion of access after augmentation. A credit facility defines the envelope under specified conditions. A government also needs continuing access to currency as debt matures and households or investors adjust their portfolios. Confidence and rollover behaviour do not follow automatically from the size approved.

A retrospective evaluation benefits from information that officials did not have at the start. To avoid hindsight bias, divide the evidence into dated decision points. Record the forecasts available at approval, the information available at augmentation and the market signals visible before a review. Then ask whether the design provided a realistic contingency if private financing failed to return. That question is more demanding than pointing out after the fact that the programme missed its objectives. It identifies where a different decision could feasibly have been made and what additional economic or social cost would have accompanied that alternative at the time.

Four completed reviews out of twelve planned equal one third. That ratio is not a disbursement percentage: different reviews can release different amounts, and some financing can be available upfront. The Fund also expressed augmented access as 1,227% of Argentina’s quota. The denominator is a Fund measure and should not be confused with national output or outstanding sovereign debt.

In 2018 President Mauricio Macri’s government faced a currency run as global interest rates rose and a drought hit exports. On 20 June 2018 the IMF approved a three-year stand-by arrangement of US$50 billion, about 1,110% of Argentina’s quota and the largest in the Fund’s history, with an immediate US$15 billion.

The peso kept falling, and in October 2018 access was raised to about US$57 billion, or 1,227% of quota, with disbursements brought forward. Inflation and recession worsened, and Macri lost the 2019 election. Only about US$44 billion was disbursed because the next president, Alberto Fernández, declined the rest.

In 2021 the IMF’s own evaluation concluded the programme had not met its goals of restoring confidence in fiscal and external viability while supporting growth. In March 2022 the Fund approved a new 30-month US$44 billion Extended Fund Facility, mainly to refinance the 2018 loan, facing about US$35 billion of repayments due in 2022–23. Argentina became the IMF’s largest debtor.

02 · Timeline

Key moments

  1. The IMF approves the stand-by arrangement.

  2. Access is augmented.

  3. The arrangement is cancelled and subsequently evaluated.

03 · Exhibit
Exhibit 1 · Argentina’s IMF programmes, 2018–2022
US$ billion502018 SBA approved (June)572018 SBA after augmentation (Oct)442018 SBA actually disbursed442022 EFF to refinance it

The 2018 arrangement was the largest in IMF history: 1,227% of Argentina’s quota after augmentation. Sources: IMF; Buenos Aires Times.

04 · Core tensions

The trade-offs at the heart of the case

Core tensions

Large official funding may buy time for an adjustment that restores private financing. If the policy path lacks credibility, private capital may use that time to reduce exposure. Announcing a large package can then temporarily strengthen available liquidity while leaving the underlying problem unresolved. An evaluation must consider the realistic alternatives available at the decision date, including their social and economic costs. A precautionary liquidity buffer can credibly deter a run and therefore never be drawn. Its value cannot be measured solely by money disbursed. But evidence of repeatedly falling private rollover would weaken the interpretation that the package was restoring voluntary finance.

Testing the evidence

The appropriate unit of observation is one programme review interval. Track net private refinancing achieved without extraordinary support and record the baseline before the decision. The most useful records are review papers, maturity calendars and reserve flow reconciliations. Align their dates and definitions before drawing an inference. In particular, allow for external risk appetite and domestic policy uncertainty. A change in that factor can move the reported outcome even when the intervention has had no effect. Separate gross issuance from amounts used to repay maturing creditors. Compare private rollover before and after review dates and trace official disbursements to their effect on usable reserves. Global risk movements can change access even without a change in domestic policy.

A related Argentine case

The 2025 programme had a large immediate disbursement at approval. In both programmes the amounts approved, paid out, due for repayment and available as usable reserves must be tracked separately across time.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    Which indicator would show that official money was substituting for private finance without restoring it?

  2. Q2

    How would you measure net private refinancing achieved without extraordinary support for one programme review interval using the available records?

  3. Q3

    Which assumption in “A funding bridge under weak rollover” would you challenge first, and how would changing it affect the decision?

  4. Q4

    Could external risk appetite and domestic policy uncertainty explain the observed change? What evidence would distinguish that explanation?

  5. Q5

    Under what conditions would you prefer redesigning the adjustment path earlier under a low-rollover scenario, and who would bear the residual risk?

Frameworks worth applying
  • Lender of last resort
  • Exceptional access
  • Confidence and credibility
  • Debt rollovers
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

Pair each financing release with an independently measurable test of market access, reserve adequacy and the feasibility of the budget path. Specify what would trigger a change of programme design. Treat rollover failure as a live downside case even when official financing initially appears ample.

  1. Ask for a huge package

    Secure US$50bn to calm markets.

  2. Augment when it fails

    Raise access to US$57bn and front-load it.

  3. Refinance with a new programme

    Use the 2022 EFF to repay the 2018 loan.

What this plan gives up

The large loan bought time and financed capital outflows, but it did not restore confidence, and Argentina ended up owing the IMF far more than any other country.

The strongest counter-argument

For the programme review team, the alternative worth costing is redesigning the adjustment path earlier under a low-rollover scenario. Give both choices the same information date. Specify what can still be reversed, who absorbs the cost if the forecast is wrong, and the point at which new evidence would justify changing course. Make the decision conditional on an observable change in net private refinancing achieved without extraordinary support. That condition lets someone outside the original decision team distinguish a sensible revision of the plan from an attempt to explain away poor results.

Metrics to watch

  • Argentina’s IMF repayments
  • Net international reserves
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.