What happened
The capacity increase provides room for additional trade. The value of that room changes hourly as demand, domestic generation and available imports change. A long-term purchase contract can give the buyer price certainty but may commit it to paying for energy that is occasionally less attractive than domestic alternatives. Short purchases preserve flexibility while leaving the buyer exposed in a regional shortage. An interconnector is useful under either arrangement, for different reasons.
A finance committee should compare the delivered cost of power, including transmission charges, losses and any fixed capacity payment, with the cost of the domestic generation it would displace. The relevant alternative is the marginal plant at the relevant hour. Comparing imports with the average cost of an entire domestic fleet can make good purchases look expensive or poor purchases look cheap. A low energy price accompanied by a large fixed charge needs sufficient utilisation to be competitive.
Reliability also depends on the circumstances when imports might disappear. If demand peaks in both countries at the same time, access to a neighbour has less diversification value than an average annual analysis suggests. Conversely, a trading link can cover a domestic outage even when average prices are similar. A board should request simultaneous stress scenarios, evidence of domestic network capacity and the rules for prioritising deliveries under constraint. It has financed the option to trade. Its procurement and dispatch decisions determine the return.
Bangladesh and India signed a memorandum of understanding on power cooperation on 11 January 2010. The Asian Development Bank approved US$100 million for the first Bangladesh–India Electrical Grid Interconnection Project, later adding US$12 million to cover cost increases, with the Power Grid Company of Bangladesh as executing agency.
The project built a 500 MW high-voltage direct current back-to-back station at Bheramara and a 400 kV line to Baharampur in India. Power began to flow on 5 October 2013, South Asia’s first cross-border HVDC link, and full 500 MW transfer capacity was reached in December 2013.
A second ADB-supported project added another 500 MW HVDC block at Bheramara, commissioned on 10 September 2018, raising transfer capacity on the link to 1,000 MW. A second 400 kV double-circuit line between the two sides was later added to improve reliability.
Cross-border electricity trade is growing in many regions because it lets countries share reserves and use cheaper sources of power. The financial case usually rests on comparing the cost of imports, including transmission charges, with the cost of building and fuelling new local plants. The risks include supply interruptions, political disagreements and currency exposure. Well-designed contracts, a mix of suppliers and clear rules for sharing reserves help countries gain the benefits while limiting those risks. For Bangladesh, the Bheramara link turned a long-discussed idea into working infrastructure within a few years. Its experience is now a reference point for further links with India and possible future trade with Nepal and Bhutan, where hydropower could one day supply Bangladeshi demand through the same kind of link.
Key moments
First interconnection loan approved.
Supplementary financing approved for cost escalation.
Second project targeted a doubling of transfer capacity.
Source: World Bank, World Development Indicators (EG.ELC.ACCS.ZS).
The trade-offs at the heart of the case
Run the comparison at the difficult hour
Take a day of fuel shortage and a day when both countries face high demand. Reconstruct what Bangladesh could buy, the price delivered and what domestic generation or unmet demand it would displace. The two days may justify different contracting approaches. I would reserve some reliable capacity for high-cost contingencies while leaving room to exploit short-term price differences, subject to executable contracts. Compare any fixed reservation fee with the value of the available energy in a simultaneous regional stress. Capacity that is routinely inexpensive but unavailable precisely when the system needs it cannot be priced as firm insurance.
When physical connection and commercial service begin on different dates
The Kuakata data cable illustrates a problem that also arises in cross-border electricity. A system can establish physical connectivity before users have a fully usable domestic service. A power link must connect to suitable domestic lines, have operating protocols and support a commercial schedule. A committee comparing commissioning dates should identify separately the first technical test, first contracted delivery and first period of reliable commercial operation. Lenders might release funds at one milestone while the country receives its major benefits at another. Documenting this difference helps explain a slow initial ramp without declaring an investment either a failure or a success too early. The important question is whether the outstanding links are funded and under the control of identified parties.
For your seminar, paper or interview
- Q1
Why can delivered electricity cost more than the quoted energy price?
- Q2
When does cross-border capacity provide insurance?
- Q3
Which domestic generator should be the cost comparator?
- Cross-border trade
- Energy security
- Capacity contracts
- Regional integration
How we would approach it
Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.
We think the Bheramara link shows how a relatively small investment in transmission can buy a large amount of power quickly. The trade-off is dependence: imports are cheap and fast to add, but the country must manage the risk of relying on another grid and paying in foreign currency.
Diversify import sources
Combine Indian imports with other regional links and domestic generation.
Price power on cost
Compare import tariffs with the full cost of new local plants each year.
Use the link both ways
Seek arrangements to export surplus power at times of low local demand.
What this plan gives up
More imports cut costs and shortages but increase exposure to foreign supply decisions and exchange-rate movements.
The strongest counter-argument
Regional power trade is a normal feature of integrated grids, as in Europe, and mutual dependence can strengthen rather than weaken energy security.
Metrics to watch
- Share of electricity supplied by imports
- Import tariff compared with domestic generation cost
Propose your solution
Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.
Published solutions
Loading published solutions…
- ADB: Bangladesh–India interconnection project evaluation ↗
- SASEC: Second grid interconnection and transfer capacity ↗
- World Bank: World Development Indicators, Access to electricity ↗
- ADB: Bangladesh–India Electrical Grid Interconnection Project ↗
- T&D World: India electricity flows to Bangladesh in first South Asian HVDC link ↗
- Grid-India: Success story of India–Bangladesh power system operation ↗
- SASEC: Second Bangladesh–India grid interconnection project ↗
- Photo: Electricity Pylon (Bhowri) in 2022.02.jpg by CAPTAIN RAJU, CC BY-SA 4.0 (cropped and resized) ↗
Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.