Skip to content
All case studies
Case study · BangladeshIndustry and trade2015–2025Last reviewed 22 November 2026

Bangladesh case studiesAsia-Pacific case studies

Bangladesh ship recyclers and IMO SENSREC

Who pays for what leaves a shipbreaking yard?

A ship can arrive at a recycling yard as a source of valuable steel and leave behind materials that cost money to handle. The proceeds from selling steel are visible and local. The cost of managing residual waste can turn up much later and somewhere else. At Sitakunda this mismatch gives the transition to regulated ship recycling a concrete financial question. How can responsible yards recover their costs without pricing themselves out of the market for ships?

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

SENSREC began in Bangladesh2015
Bangladesh acceded to the Hong Kong Convention2023
Convention entered into force internationallyJune 2025
01 · The situation

What happened

IMO’s SENSREC programme began in Bangladesh in 2015. Its work included studies, training and support for infrastructure to treat, store and dispose of hazardous waste. Bangladesh’s 2023 accession helped trigger the conditions for the Hong Kong Convention to enter into force in June 2025. A treaty milestone changes obligations. It does not establish that every yard has already completed an upgrade or that a downstream facility accepts every waste stream.

A yard deciding what to bid for a vessel estimates the value of recovered material less labour, working capital and disposal costs. If a competing bidder can pass disposal costs to someone else, a well-equipped yard may lose even when it is the more efficient recycler once all costs are counted. Verifiable disposal records and scrutiny by shipowners can make the more complete bid commercially credible. A certificate at the gate has limited value if the chain of custody ends at the road outside.

Shared treatment capacity can spread fixed costs across several businesses. It also introduces a coordination risk. A facility with too little contracted throughput must either raise its fee or seek public support. A fee that is too high can push work elsewhere. Consider a modest availability payment combined with a variable charge based on what each yard actually delivers. Weigh that against an obligation for each yard to secure an independently audited disposal contract. Both approaches require enforcement and a way to deal with abandoned liabilities after a yard closes.

Bangladesh deposited its instrument of accession to the Hong Kong Convention with the IMO on 26 June 2023. Liberia acceded the same month, and together the two accessions met the convention’s entry-into-force conditions. The convention entered into force internationally on 26 June 2025, two years later.

The IMO credits its SENSREC project, funded by the Government of Norway, with helping Bangladesh prepare for accession. SENSREC worked on legislation, hazardous-waste management and worker training. Bangladesh had earlier passed a Ship Recycling Act in 2018, which committed it to ratifying the convention by 2023.

Bangladesh is one of the world’s largest ship-recycling countries by capacity. Under the convention, ships must carry an inventory of hazardous materials, and recycling facilities must be authorised and follow a ship-specific recycling plan, so responsibilities fall on shipowners, flag states and recycling states alike.

The same logic applies well beyond ship recycling. Whenever a business earns money from a product today but leaves a clean-up cost for later, the true margin is lower than the accounts show. Investors and regulators can ask a simple question: who pays for the waste, when, and from what money? If the answer is unclear, the cheapest operator is often the one passing the most cost to someone else, and that is not a fair basis for competition. Making that cost visible early is what allows careful yards to compete on equal terms.

02 · Timeline

Key moments

  1. The SENSREC programme began in Bangladesh.

  2. Bangladesh acceded to the Hong Kong Convention.

  3. The convention entered into force.

03 · Exhibit
Exhibit 1 · Bangladesh: Industrial value added including construction
% of GDP31.2201733.3202134.02025

Source: World Bank, World Development Indicators (NV.IND.TOTL.ZS).

04 · Core tensions

The trade-offs at the heart of the case

Read the final receipt

Follow one consignment from a ship’s inventory through the yard, transporter and receiving facility. Check that the last party can accept and account for it and that the contracted price covers the full journey. A cheap trucking quote is meaningless if the lawful destination later refuses delivery. A shared facility should obtain minimum-volume commitments, but those commitments must leave room for yards to reduce waste or change their mix of vessels. I would compare the cost of independently verified disposal with the discount a responsible yard needs when bidding for ships. This puts the commercial pressure in front of both yard owners and ship sellers.

An infrastructure fee can reward the wrong behaviour

Patenga’s terminal concession provides a useful comparison for a communal disposal facility. At a port, a poorly designed handling incentive can move a queue from the quay into the yard. At a recycling complex, a weight-based waste charge can move the recorded burden from a licensed handler to an unobserved destination. The common question is where responsibility ends. A shipowner seeking reliable end-of-life handling could request a price covering verified final receipt rather than merely removal from the yard. A regulator could reconcile reported deliveries with the receiving facility’s records. The two checks have different strengths. A customer has leverage before selling the ship, while public oversight remains possible after commercial responsibility has changed hands.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    Who should bear the fixed cost of shared treatment capacity?

  2. Q2

    What should a shipowner check beyond the yard gate?

  3. Q3

    How could a fee encourage proper disposal while financing supervision?

Frameworks worth applying
  • Externalities
  • Polluter pays
  • Regulatory compliance
  • Shared infrastructure
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

We would make the cost of hazardous waste visible at the moment a ship is bought, not when the steel has been sold. Once the price of a vessel includes the cost of disposing of what it carries, yards that invest in safe handling stop being undercut by yards that do not.

  1. Price waste into the purchase

    Require a costed hazardous-materials plan before a ship can be beached.

  2. Fund one shared treatment site

    Let several yards use a licensed central facility rather than each building its own.

  3. Publish yard-level compliance

    Make inspection results public so shipowners can choose compliant yards.

What this plan gives up

Higher compliance costs can push ship sales towards cheaper yards in other countries, so Bangladesh could lose volume before the rules apply everywhere.

The strongest counter-argument

Now that the Hong Kong Convention is in force, the regulation itself may do most of the work: shipowners face their own obligations, so national add-ons risk duplicating rules and raising costs without improving safety much further.

Metrics to watch

  • Number of yards with approved compliance statements
  • Capacity of licensed hazardous-waste treatment
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.