Which parts belong in a 3D-printing centre?

BMW opened a dedicated additive manufacturing campus near Munich in 2020.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

Reported construction cost of the additive manufacturing campus~€15m
01 · The situation

What happened

BMW opened a dedicated additive manufacturing campus near Munich in 2020. It brought together prototyping, series parts, research and training. A printer avoids a dedicated tool for some components. It still needs machine time, finishing, inspection and a suitable material. At higher volumes a tool that initially looked expensive can become the cheaper choice.

Additive manufacturing, often called 3D printing, builds parts layer by layer from plastic or metal, without the moulds and dies used in conventional production.

BMW first used the technology in 1991 to make prototype parts for concept cars, according to BMW.

In June 2020 BMW officially opened its Additive Manufacturing Campus at Oberschleissheim near Munich, after investing about €15 million.

The campus brings together production of prototype and series parts, research into new 3D-printing technologies and training of employees.

At opening it employed about 80 people and ran about 50 industrial systems working with metals and plastics, according to 3DPrint.com.

In 2019 BMW produced about 300,000 parts by additive manufacturing.

Printed parts have been used in series models such as the BMW i8 Roadster and the MINI John Cooper Works GP.

BMW has also invested in additive manufacturing start-ups, including Desktop Metal and Xometry, through BMW i Ventures.

The exhibit shows the scale of BMW’s 3D-printing operation. Three hundred thousand parts a year is significant, though small compared with the millions of parts BMW uses overall.

Break-even analysis helps decide when to print and when to make a tool. A tool costs a lot up front but makes each part cheaply; printing has no tool cost but a higher cost per part.

For small volumes, printing is usually cheaper. For large volumes, tools usually win.

Printing also allows complex shapes that are hard to make in other ways, such as lightweight structures with internal channels.

It is especially useful for prototypes, special editions, spare parts for older models and tools used in factories.

Bringing all activities together in one campus helps share knowledge between research, prototyping and production.

Many industries, from aerospace to medical devices, use additive manufacturing for similar reasons.

The technology continues to improve, which may shift the break-even point towards higher volumes over time.

For students, the case shows how a new production method finds its place alongside traditional ones.

Key concept: capital versus operating spending. Capital expenditure, or capex, buys long-lived assets such as factories, machines and tooling; its cost is spread over many years through depreciation. Operating expenditure, or opex, covers day-to-day costs such as wages, energy and materials.

The distinction matters because capex commits a company for years. Once a plant or production line is built, it must be used at high volume to earn back its cost, so capex decisions are among the most important a manager makes.

Key concept: break-even analysis. The break-even point is the volume at which revenue covers all costs. Below it a product loses money; above it, it makes a profit.

For products with high fixed costs and low volumes, the break-even point may never be reached through sales alone, so companies must judge whether other benefits, such as learning or brand image, justify the investment.

Key concept: operating leverage. A business with high fixed costs and low variable costs has high operating leverage: once fixed costs are covered, each additional sale adds a large amount of profit. Car making is a classic example, with heavy spending on design, tooling and plants.

The flip side is that falling sales hit profits hard, because fixed costs remain. That is why car makers care so much about keeping factories busy.

Key concept: unit economics. Unit economics looks at the revenue and costs linked to a single unit, such as one car or one customer. If each unit earns more than it costs to make and sell, growth adds profit; if not, growth adds losses.

Fixed costs such as development and tooling are spread across all units, so the cost per unit falls as volume rises. That is why low-volume products need high prices, and why volume matters so much in the car industry.

02 · Timeline

Key moments

  1. BMW already uses additive manufacturing

  2. Campus opens near Munich

  3. Prototypes, production parts and training share the facility

03 · Exhibit
Exhibit 1 · BMW Additive Manufacturing Campus at opening (2020)
as reported80Employees50Industrial 3D-printing systems300Parts printed by BMW in 2019 (thousands)

Sources: BMW Group; 3DPrint.com.

04 · Core tensions

The trade-offs at the heart of the case

A closer look

The first printed part may be cheaper than making a mould, yet the hundredth printed part still occupies machine time. Ask what else is waiting to use the printer and charge the displaced job’s contribution when the machine is full. That cost can vanish on an idle night shift. The crossover volume is therefore a property of the factory schedule as well as the two manufacturing processes.

The alternative on the table

For comparison, consider the option to use conventional tooling for every component order. The related case “When is a spare part worth putting back into production?” supplies a useful reference point. BMW Group Classic announced a carefully reconstructed gearbox for the 328 in 2013. A rare 328 gearbox makes the trade-off vivid. The required material and authenticity may rule out printing even at low volume. Select the process only after mechanical qualification, not merely because the batch is too small for a cheap tool.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    How would an idle night shift change the crossover point for printing a part?

  2. Q2

    Which finding in the records on total cost per accepted part at the proposed batch size would persuade you to use conventional tooling for every component order?

  3. Q3

    Compare this decision with “When is a spare part worth putting back into production”. Which difference between the cases would change your recommendation?

Frameworks worth applying
  • Additive manufacturing
  • Make versus tool
  • Prototyping
  • Small-series production
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

We think the Additive Manufacturing Campus was a sensible investment. Bringing 3D printing for prototypes, series parts, research and training under one roof builds expertise, and the technology is ideal for small volumes and complex parts. For large volumes, conventional tools usually remain cheaper per part.

  1. Match method to volume

    Print small runs, tool large ones.

  2. Build expertise

    Concentrate skills in one centre.

  3. Integrate with production

    Plan printed parts into vehicle programmes.

What this plan gives up

3D printing avoids tooling but costs more per part at high volume.

The strongest counter-argument

Some argue outsourcing printing would be cheaper.

Metrics to watch

  • Cost per printed part
  • Share of parts in series production
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…