Case study · ArgentinaProcess commissioningJuly–December 2024Last reviewed 22 November 2026

Argentina case studiesAmericas case studies

Eramet and Centenario

The first lithium carbonate is only the first test

A saleable batch and a repeatable industrial process have different implications for the next capital commitment.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

Plant design24,000 t/year
Partner stake bought back49.9%
Site altitude, approximately4,000 m
First carbonate announcementDecember 2024
01 · The situation

What happened

At Centenario-Ratones, Eramet brought a direct lithium extraction plant into commissioning in the high Andes. A December announcement established that the plant had produced its first lithium carbonate. During the same year Eramet also bought out its joint-venture partner. Investors had to evaluate two separate developments. The chemistry had cleared a visible milestone, and a single owner was taking a larger share of the financial consequences of everything that remained to be proved.

Collecting payment for a qualified batch can be more revealing than reporting the mass of the first carbonate produced. An invoice establishes a buyer and a price. A later receipt, reconciled to the invoice and quality adjustments, establishes the commercial terms actually achieved. Neither document alone proves that the process can repeat at design scale. An operating dashboard could follow the very same batch through production, testing, dispatch and settlement. If inventories build between two stages, the queue locates the next problem. Solving that problem might create more value than expanding an upstream stage that was already running well, even if the latter expansion produces a more impressive headline.

A 24,000-tonne annual design corresponds to an average 2,000 tonnes a month at full annual output. A first batch has no published denominator of continuous running hours in that simple calculation. It cannot be used to infer a monthly run rate. Likewise, buying the partner’s 49.9% changes the parent’s economic exposure without adding a single tonne of physical capacity.

Eramet, a French mining group, spent years developing the Centenario-Ratones lithium brine deposit in Salta province, at about 4,000 metres above sea level. After running a pilot plant since 2019, it started building its first plant in October 2021 in partnership with China’s Tsingshan. The plant uses Eramet’s own direct lithium extraction process and was inaugurated in July 2024.

On 24 October 2024 Eramet bought back Tsingshan’s 49.9% stake in Eramine Sudamerica, the company that owns the plant, for a net cash cost of US$699 million, regaining 100% ownership. It said it would reassess the scope and timing of future expansion. On 24 December 2024 it announced its first lithium carbonate, making it the first European company to produce lithium carbonate at industrial scale.

The plant is designed for 24,000 tonnes a year, and Centenario has resources of more than 15 million tonnes of lithium carbonate equivalent.

Direct lithium extraction pulls lithium out of brine in days rather than the months required by evaporation ponds, which is why many companies see it as the industry’s future.

02 · Timeline

Key moments

  1. Eramet inaugurates the extraction plant and begins commissioning.

  2. Eramet announces it has regained full ownership.

  3. Eramet reports first lithium carbonate.

03 · Exhibit
Exhibit 1 · Eramet’s Centenario lithium project
As stated24,000.0Plant design (t/yr lithium carbonate)49.9Partner stake bought back (%)699.0Net cash cost of buyback (US$m)15.1Resource (Mt lithium carbonate equivalent)

Mixed units; each bar is labelled. Eramet bought Tsingshan’s 49.9% for a net US$699m on 24 Oct 2024 and announced first lithium carbonate on 24 Dec 2024. Sources: Eramet.

04 · Core tensions

The trade-offs at the heart of the case

Core tensions

A commissioning team can make a good batch by giving it unusually close attention. Sustaining product specifications when brine characteristics vary is a harder operating challenge. Buyers may require consistent deliveries before qualifying a material for a particular application. In that interval finished material can accumulate, tying up cash even while reported production grows. A specialist can absorb training and variability during commissioning, making its higher quoted unit fee attractive. Ownership becomes more defensible when the operation learns to deliver stable quality and the avoidable external bill is repeatable across months.

Testing the evidence

The appropriate unit of observation is one production batch. Track tonnes accepted by customers within specification and record the baseline before the decision. The most useful records are batch assays, customer acceptance certificates and inventory ageing. Align their dates and definitions before drawing an inference. In particular, allow for a temporary switch to easier feed material. A change in that factor can move the reported outcome even when the intervention has had no effect. Divide lots into qualification cohorts by customer and product grade. Follow their sale, price adjustments and payment. If rejected batches disappear from the dataset instead of being carried as inventory or losses, apparent quality and cash conversion both improve on paper.

A related Argentine case

At Rincón the gap between design capacity and a production target frames the investment decision. Centenario adds a commercial hurdle: even physically produced carbonate must meet a customer’s specification and payment conditions.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    Which monthly report would reveal that apparently successful commissioning is absorbing cash?

  2. Q2

    How would you measure tonnes accepted by customers within specification for one production batch using the available records?

  3. Q3

    Which assumption in “Paying for a qualification line” would you challenge first, and how would changing it affect the decision?

  4. Q4

    Could a temporary switch to easier feed material explain the observed change? What evidence would distinguish that explanation?

  5. Q5

    Under what conditions would you prefer a longer qualification campaign before committing expansion capital, and who would bear the residual risk?

Frameworks worth applying
  • Joint-venture buyouts
  • Technology risk
  • Commissioning ramp-ups
  • Capital allocation
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

Release expansion funds against a run of independently documented product acceptance, stable recovery and manageable reagent costs. Track inventory by grade and customer qualification status. Preserve enough liquidity to support a slow transition from first product to regular cash receipts.

  1. Buy out the partner

    Pay US$699m to regain 100% control.

  2. Commission new technology

    Start Eramet’s own direct lithium extraction process at industrial scale.

  3. Reassess expansion

    Review the timing of a second phase.

What this plan gives up

Full ownership gives Eramet control and all the upside, but it also takes on all the ramp-up risk of a new technology, at a time when lithium prices were low.

The strongest counter-argument

For the plant owner, the alternative worth costing is a longer qualification campaign before committing expansion capital. Give both choices the same information date. Specify what can still be reversed, who absorbs the cost if the forecast is wrong, and the point at which new evidence would justify changing course. Make the decision conditional on an observable change in tonnes accepted by customers within specification. That condition lets someone outside the original decision team distinguish a sensible revision of the plan from an attempt to explain away poor results.

Metrics to watch

  • Centenario ramp-up
  • Eramet debt
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.