Skip to content
All case studies
Case study · IndonesiaAugust 2021 transferLast reviewed 22 November 2026

Indonesia case studiesAsia-Pacific case studies

Pertamina Hulu Rokan

How much drilling can a mature oilfield justify?

A new operator can take over an old oilfield at midnight. Reservoir decline does not pause for the transfer. A rise in production after a drilling campaign is valuable only to the extent it exceeds what the old wells would have produced, at an acceptable cost. The new team needs to establish that counterfactual before committing its next tranche of capital.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

Active wellsMore than 11,000
New wells drilled since handover1,539
Share of national oil outputAbout 25 percent
01 · The situation

What happened

Indonesia’s energy ministry described preparations for the Rokan handover in March 2021 . Its August statement records that operations passed from Chevron Pacific Indonesia to Pertamina Hulu Rokan on 9 August 2021. It places the start of production in 1951 . The long operating history is relevant because the choice concerns sustaining and recovering output from an established asset, with existing facilities and obligations, rather than discovering a new producing province.

The ministry dates discovery to 1941 and production to 1951 . The eighty years between discovery and handover include time before production began. Conflating those intervals would exaggerate producing history and potentially distort comparisons with the operating life of another field.

In 2023 PHR also reported new oil and gas resources in existing Rokan fields after exploration studies.

Rokan also matters for Pertamina’s balance sheet: it supplies about 30 percent of the company’s national oil output, according to PHR, and all of its crude goes to Pertamina’s own refineries.

Pertamina stopped the decline but has not delivered the boom it promised. Under Chevron, Rokan had been producing about 150,000 barrels a day on average. After the handover on 9 August 2021, Pertamina Hulu Rokan averaged 162,000 bopd through November 2021 and set targets of 180,000 bopd for 2022, 270,000 for 2024 and 300,000 for 2025, backed by plans to drill 400 to 500 wells a year with up to 20 rigs.

The drilling happened; the targets did not. By the end of 2024 PHR had drilled 1,539 new wells and lifted 58 million barrels that year, with output above 160,000 bopd. Energy ministry data put 2023 production at 161,230 bopd, enough to overtake the Cepu Block as Indonesia’s largest producer, and 157,220 bopd in the first half of 2024. In June 2024 President Joko Widodo cited 162,000 bopd, about a quarter of national output.

Rokan is enormous and old. It has more than 11,000 active wells, 13,000 kilometres of pipeline and has produced more than 11 billion barrels from fields such as Minas and Duri, where steam injection is used. In that kind of field most new wells replace lost production rather than add to it, so the value of each drilling campaign depends on how fast output would have fallen without it.

02 · Timeline

Key moments

  1. Oil discovered

  2. Production begins

  3. Operations pass from Chevron to Pertamina Hulu Rokan

  4. PHR targets 300,000 bopd by 2025

  5. Production reported at 162,000 bopd

  6. 58 million barrels lifted

03 · Exhibit
Exhibit 1 · Rokan Block oil production
thousand barrels a day150Under Chevron (avg.)1622021 to Nov (PHR)1612023 (ESDM)157H1 2024300Target for 2025 (set in 2021)

The 2025 target of 300,000 bopd was set by PHR in December 2021 and has not been met. Sources: Liputan6; Pertamina; Kontan citing ESDM.

04 · Core tensions

The trade-offs at the heart of the case

Compare decline curves, not two calendar totals

A programme that keeps production flat can create value if output would otherwise have declined. Conversely, a short burst can simply bring forward barrels that would have been produced later. Arrange the cash flows by production month and include the ongoing cost of managing water, maintaining shared equipment and eventually retiring assets. Do not assign every barrel from the field to the newest intervention. Historical records can bridge the change in operator. Well performance, maintenance backlogs and downtime establish a baseline against which both teams can be judged. If record systems change during the handover, a change in classification can appear to be an operational improvement. A joint reconciliation of production and costs before the transition has investment value because it prevents later capital decisions from relying on a false trend.

Decide against the next-best well

Rank possible workovers by additional production after natural decline, incremental cost and the probability of mechanical success. A large producer in present output need not be the best next candidate. An apparently modest well may have a cheap, reversible repair and a better payoff per day of scarce crew time. The incoming operator should preserve the earlier maintenance history so an apparent change in performance is not merely a break in how activity was recorded.

What a national oil company is asked to do

Pertamina operates Rokan under pressure from two directions. The government wants more domestic oil to cut imports and expects the national company to deliver. Pertamina’s shareholders and lenders want returns on the capital it spends. In a mature field those goals can conflict: drilling hundreds of wells keeps production numbers high but may earn a low return on each additional barrel. Clear reporting of the decline that drilling offsets is the best way to make that trade-off visible.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    How would you estimate output without the new drilling programme?

  2. Q2

    Which costs should be allocated to the incremental barrels?

  3. Q3

    When does front-loading production make a modest project worth doing?

  4. Q4

    Why might a smaller well deserve the first workover?

  5. Q5

    Which operating records should the incoming operator preserve?

Frameworks worth applying
  • Decline-curve analysis
  • Capital discipline in mature fields
  • National oil company strategy
  • Target-setting and accountability
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

Pertamina deserves credit for holding Rokan’s output steady, which is real value in a field this mature. But the 300,000 bopd target was never credible, and capital should now be allocated on the measured gain over the decline curve for each well package, not on headline production goals.

  1. Report against the decline

    Publish expected production without new drilling alongside actual output.

  2. Fund in packages

    Release capital for the next batch of wells only when the last batch beats its forecast.

  3. Use proven recovery methods

    Extend steam and chemical injection where results justify the cost.

What this plan gives up

Aggressive drilling props up output but can destroy value if new wells mostly replace production that existing wells would have delivered anyway.

The strongest counter-argument

Without ambitious targets, a state company may under-invest in a declining field, and steady output in a field this old already beats most forecasts made at the handover.

Metrics to watch

  • Output per new well against forecast
  • Cost per barrel of production gained over decline
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.