JICA, IDCOL and BIFFL

Who decides whether an industrial machine really saves energy?

A manufacturer looking at an efficient machine sees a supplier quote and an electricity bill. A public lender sees an additional problem. Would the company have bought the same machine with ordinary financing anyway? JICA’s Bangladesh energy efficiency and conservation financing programme used financial intermediaries and technical support to promote efficient equipment. The preparatory survey identified IDCOL and BIFFL as intermediary institutions. Specific end borrowers and technologies would emerge after the programme was designed.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

IDCOL and BIFFL identified in the preparatory survey2 financial intermediaries
Credit routed through financial institutionsConcessional financing
Programme design pairs funding with adviceTechnical support
01 · The situation

What happened

That structure delegates selection and spreads the burden of appraising individual projects. It also creates two tests that can come apart. A borrower with impeccable credit may be making a routine replacement that would happen without concessional funds. A company with large potential energy savings may have a weak balance sheet. Counting all disbursed loans as evidence of energy impact rewards the easiest part of the job and conceals the other.

A loan officer should establish the alternative machine, remaining life of the existing equipment and expected production schedule. Comparing a new motor with a broken old one would attribute an inevitable replacement to the programme. Comparing it with the efficient model the business would actually purchase gives a smaller and more honest saving. Metering energy before and after also requires adjustment for changes in production hours and product mix.

A fixed list of eligible technologies makes a credit line easier to administer and can reduce costly technical disputes. A performance-based route can accommodate unconventional high-return projects but needs more expensive verification. The intermediary might combine a simple list for small loans with technical review for large or unusual investments. Publish separately the amount lent, estimated savings and sampled verified savings. The programme can then learn whether cheap capital, limited technical knowledge or uncertainty about payback is the main obstacle for firms.

JICA designed its Energy Efficiency and Conservation Promotion Financing Project after a technical cooperation project that developed Bangladesh’s Energy Efficiency and Conservation Master Plan between 2014 and 2015. A preparatory survey report was published in February 2016.

The loan agreement for the first phase was signed in June 2016 for about ¥11,988 million, roughly US$95 million. It was routed through two non-bank financial institutions, IDCOL and BIFFL, which lend to end users for energy-efficient equipment, with consultants funded to support them.

A second phase followed, with a loan agreement signed on 29 May 2019 for about ¥20,076 million. JICA described the aim as encouraging the installation of energy-efficient equipment and supporting government policy on energy efficiency.

Energy-efficiency finance is a global challenge. Studies regularly find investments with short payback periods that firms still do not make, because managers lack information, lenders do not understand the technology, or capital is needed elsewhere. Programmes that combine credit with technical help, and that measure real savings afterwards, tend to build lasting markets. For investors, firms that systematically cut energy use often enjoy lower costs and more stable margins when energy prices rise. For a factory owner, a practical first step is simple: list the largest energy users on site, ask what each costs to run per year, and compare that with the price of a more efficient replacement. Motors, compressors and boilers often top the list. Where the saving repays the cost within a few years, the case for a loan is strong.

02 · Timeline

Key moments

  1. Intermediaries and potential end-use investments were assessed.

  2. JICA evaluated the concessional financing project and signed the yen-loan agreement.

03 · Exhibit
Exhibit 1 · Bangladesh: Primary energy intensity
MJ per unit of PPP GDP2.320082.220122.22016

Source: World Bank, World Development Indicators (EG.EGY.PRIM.PP.KD).

04 · Core tensions

The trade-offs at the heart of the case

Compare quotes a borrower could really buy

Ask the firm to document the alternative supplier and lead time, including expected quality, downtime and warranty. A high-efficiency machine may also be the only one meeting a buyer’s delivery deadline. In that instance a finance programme can still facilitate investment, but the claimed energy additionality needs a narrower explanation. I would sample completed loans and measure actual consumption per comparable unit, including idle time and maintenance. Feed the results back into eligibility rules. A short approved list is defensible when the programme can retire technologies that the market would now adopt routinely at commercial interest rates. A credible audit follows one borrower from its original investment plan through selection, purchase, commissioning and settled electricity bills. A collection of supplier certificates answers only one part of that sequence.

A good credit and a good machine are separate findings

Hamza Textiles illustrates the value of first-pass quality in dyeing. An equipment-finance programme can learn from that example without assuming every textile applicant enjoys the same saving. A technically excellent machine bought by a company with no qualified customers may still be a bad credit. An established borrower with a full order book can repay even if the machine delivers little of the claimed energy reduction. Separate the underwriting recommendation from the technical recommendation and record where they disagree. The disagreement is useful evidence about the financing gap. It can indicate a need for technical advice, a different repayment structure or a decision to leave a routine commercial purchase to the ordinary market.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    How would the lender identify a replacement that was already budgeted?

  2. Q2

    Which meter readings would survive a change in production volume?

  3. Q3

    When is technical appraisal worth its added cost?

Frameworks worth applying
  • Two-step lending
  • Energy efficiency economics
  • Payback analysis
  • Information gaps
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

We think the hardest part of energy-efficiency lending is not the money but the evidence. Factories often know a new boiler or motor will save energy but cannot prove the savings to a lender, so pairing cheap credit with technical audits is what turns good ideas into bankable loans.

  1. Fund audits up front

    Pay for independent energy audits so factories can show expected savings.

  2. Measure savings after installation

    Check actual energy use so lenders learn which equipment performs.

  3. Standardise small loans

    Create simple loan products for common equipment such as motors, boilers and compressors.

What this plan gives up

Detailed audits and monitoring add cost and time, which can put off smaller firms that would benefit most.

The strongest counter-argument

Some argue that higher energy prices alone would push firms to invest in efficiency, making subsidised credit unnecessary and potentially wasteful.

Metrics to watch

  • Energy saved per taka lent
  • Share of loans to small and medium firms
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.