What happened
SP announced further customer developments in 2022 and explored thermal storage with the Energy Market Authority. Buildings have different cooling patterns, creating opportunities to spread plant capacity across users. A hotel and an office tower may reach their peaks at different times. If they peak together during a hot afternoon, however, their demands do considerably less to reduce the capacity the network must maintain.
The comparison for a property owner includes the avoided chiller plant, maintenance and usable space recovered inside the building. The comparison for the network includes pipes, pumping losses and spare capacity. Adding a building next door can be attractive while adding an identical building beyond an expensive road crossing can destroy value. Counting connected floor area misses that difference.
A district system can free expensive floor area in a customer’s building by reducing the need for individual plant. That benefit may be captured by the building owner as rent, by the occupier as extra usable space or by the network through a connection fee. Avoid adding all three at full value in a social appraisal. The underlying additional usable area is one gain whose financial proceeds are distributed through contracts.
Minister Lawrence Wong noted at the 2016 commissioning that removing rooftop cooling towers allowed buildings to use those spaces for gardens and pools, a benefit that also has commercial value for owners. In 2024 Suntec City agreed to connect, extending the network beyond the original Marina Bay area. At the time 24 developments were connected, with 38 expected to be served in total.
Since 2006 Singapore District Cooling, part of SP Group, has supplied chilled water from central plants to buildings in Marina Bay, including Marina Bay Sands, Marina Bay Financial Centre and Gardens by the Bay. In 2016 the network was formally commissioned after a major expansion, which SP said made it the world’s largest underground district cooling network and saved customers more than 40% in energy.
Instead of each building running its own chillers and cooling towers, the network chills water centrally and pipes it underground. That frees rooftop and basement space and lets the operator run large, efficient machines. In 2022 SP announced five new developments joining, bringing the buildings served to 28 and capacity to 70,000 refrigeration tons, with an expected cut in carbon emissions of 19,439 tonnes a year. In 2023 it signed letters of intent with four more developments and planned capacity of 75,000 tons by 2027.
In August 2022 SP and the Energy Market Authority announced a pilot of thermal energy storage at the George Street substation, linked to the network’s expansion.
District cooling works like other utility networks: high fixed costs and low marginal costs. Each additional building improves returns once pipes are laid. For property owners, the decision is whether to buy cooling as a service under a long contract rather than owning equipment. Similar networks operate in Dubai, Paris and Hong Kong.
Key moments
SP announced further buildings for its Marina Bay cooling network.
SP and EMA described a thermal storage pilot linked to network expansion.
Approximate figures. The network has operated since 2006 and is described as the world’s largest underground district cooling network. Sources: Eco-Business; SP Group.
The trade-offs at the heart of the case
Moving the peak across the street
An office building and a hotel can each have a high peak cooling load but reach it at different times. Their combined demand may require less plant than the sum of two separate systems. Check coincident readings before booking that saving. A common weather event can make the peaks converge and cause the network operator to need spare capacity just when it is most expensive. A building considering connection may already own chillers with several useful years left. The right comparison is to keep them until replacement and then choose anew, or to switch early and lose some remaining service value. Using the full replacement cost as an immediate saving can exaggerate the case for early conversion. In another building, equipment near the end of its life could make the same offer timely. Network expansion strategy should take this uneven replacement calendar seriously, since a missed window may leave a prospective customer committed to independent equipment for years.
For your seminar, paper or interview
- Q1
Which buildings make the most valuable neighbours in a cooling network?
- Q2
How does a delayed tower opening affect the economics of an installed pipe?
- Q3
When might thermal storage lose money even if off-peak electricity is cheaper?
- Q4
How would you test whether new developments taking longer to reach normal occupancy explains the evidence?
- Q5
Which observation would most change your estimate of the benefit of shared cooling capacity, and why?
- Infrastructure networks
- Shared capacity
- Long-term service contracts
- Energy efficiency
How we would approach it
Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.
Map expected demand by hour and connection route. Test whether an anchor customer might delay occupation after pipework is already installed. A thermal store can shift some electricity use across time, yet storing and delivering cold water entails losses. Evaluate the actual tariff spread and avoided peak investment alongside the equipment cost.
Sign anchor customers
Secure long-term contracts with large buildings before extending pipes.
Share peak capacity
Serve buildings with different usage patterns so central plants run efficiently.
Add storage
Use thermal storage to shift cooling production to cheaper or less congested hours.
What this plan gives up
A shared network cuts energy use and frees space in buildings, but it requires large upfront investment in pipes and plants that pays off only if enough buildings connect for many years.
The strongest counter-argument
Individual systems give owners control and insulate them from some network dependencies. A shared system can improve expertise and utilisation while making continuity dependent on common infrastructure. Specify outage arrangements, metering and tariff adjustments before assuming every participant benefits equally from economies of scale.
Metrics to watch
- capacity required at the coincident network peak
- the benefit of shared cooling capacity
- Buildings connected
- Energy saved per refrigeration ton
Propose your solution
Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.
Published solutions
Loading published solutions…
- SP Group · Marina Bay network expansion ↗
- EMA · George Street thermal storage pilot ↗
- SP Group · District cooling operations and storage ↗
- SP Group: Marina Bay network saves more than 40% in energy (2016) ↗
- SP Group: Expansion with more developments (2023) ↗
- Eco-Business: Beating urban heat at scale ↗
- Singapore District Cooling presentation (GPSC) ↗
- Photo: Singapore skyline at sunset viewed from Gardens by the Bay East - 20120426.jpg by Chensiyuan, CC BY-SA 4.0 (cropped and resized) ↗
Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.