Project Ubin and the price of waiting for settlement

A bank can be solvent at closing time and still need cash at noon to complete a payment. Project Ubin explored whether distributed ledgers could improve clearing and settlement. The financial issue was the amount of liquidity and coordination needed to move money safely between institutions.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

ProgrammeProject Ubin
StructureFive phases
MarketWholesale settlement
Phase five report2020
01 · The situation

What happened

The Singapore programme proceeded in phases. It explored tokenised Singapore dollars, payment settlement and links between different networks. Work with Canada’s Project Jasper demonstrated an experimental cross-border exchange. The final phase examined a multicurrency network and potential commercial applications. A working experiment established technical feasibility under specified conditions. A bank evaluating adoption still needed a business case for a production service.

The programme distinguished delivery versus payment for securities from payment versus payment across currencies. The former links the transfer of an asset to its payment. The latter links transfers of two currencies. Their common aim is to avoid giving up one leg while remaining exposed on the other. The assets, market hours, counterparties and legal rules differ, so a successful test of one mechanism is not complete evidence for another.

Moving two legs of a transaction together can reduce the danger that one side delivers while the other fails. It can also require funds to be available at the same moment on the relevant systems. Netting can reduce that funding demand but may introduce dependencies on other payments arriving in time. Faster doesn’t automatically mean cheaper if participants must hold larger idle balances.

Pilots can deliberately give participants abundant test liquidity and a common decision timetable. These choices help isolate technical behaviour but can conceal the cost of real-world coordination. A production service must also support institutions that do not join immediately. The cost of bridging a new network to established systems can dominate the early years if most payments still have one end outside the new arrangement.

Project Ubin was a multi-year collaboration led by the Monetary Authority of Singapore to test whether blockchain and distributed ledger technology could improve how banks and markets settle payments and securities. It ran from 2016 through five phases and produced six reports. The second phase, reported in November 2017, examined how a real-time gross settlement system could run on a ledger.

On 13 July 2020 MAS and Temasek released the report on the fifth and final phase. It described a multi-currency payments network prototype, built with J.P. Morgan, that settled payments in different currencies on the same network. The project said it had tested smart contracts for delivery-versus-payment settlement, escrow for trade and trade finance payments, and more than 40 financial and non-financial firms took part in workshops.

For banks, the attraction of faster settlement is less about speed and more about money tied up during the day. Banks must hold enough central bank money to make payments before incoming funds arrive. A system that matches payments more efficiently can reduce that liquidity need, freeing cash for other uses. But building production infrastructure requires legal certainty, operating standards and many participants, which is why most central bank experiments stop short of live systems.

MAS said Ubin laid foundations for later work on digital assets and digital money. For readers anywhere, the case illustrates how regulators can reduce risk for an industry by funding shared experiments, and why the business case for new infrastructure depends on adoption by many institutions at once.

02 · Timeline

Key moments

  1. MAS and industry partners began Project Ubin.

  2. Singapore and Canadian experiments demonstrated a cross-border, cross-currency transaction.

  3. The final phase examined a multicurrency payments network.

03 · Exhibit
Exhibit 1 · Project Ubin: phases and duration
Year2016Project launched2017Phase 2 report (RTGS)2020Phase 5 report

Five phases in all; the final report was released by MAS and Temasek on 13 July 2020. More than 40 financial and non-financial firms took part in Phase 5 workshops. Sources: MAS; IBS Intelligence.

04 · Core tensions

The trade-offs at the heart of the case

Settlement at noon and settlement by close

Lay out payments in their actual order. A bank receiving money at three cannot fund a noon payment with those proceeds unless it borrows or the other party waits. A faster message does not solve that funding mismatch. Study peak intraday balances and which trades queue during stress; an end-of-day balance of zero is compatible with either a very economical or a very expensive system. Consider a participant that has tested the new network successfully with a small set of sophisticated institutions. It still needs a way to serve a counterparty that joins later, runs different systems or closes its books in another time zone. Gains available only after universal adoption should be discounted for the transition period. A phased adoption plan can start with payment flows where both ends are already prepared and where manual reconciliation is costly. It should identify the smallest commercially meaningful network, because a technically functional single institution has no one with whom to settle.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    Why can simultaneous settlement demand more cash at a particular moment?

  2. Q2

    What would distinguish technical feasibility from a bankable service?

  3. Q3

    Which payments should be included in an honest liquidity simulation?

  4. Q4

    How would you test whether unusually coordinated payment submissions during a pilot explains the evidence?

  5. Q5

    Which observation would most change your estimate of liquidity tied up between payment legs, and why?

Frameworks worth applying
  • Payment settlement
  • Liquidity management
  • Technology pilots
  • Public-private collaboration
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

Measure how much liquidity a representative set of payments consumes through the day. Compare the new arrangement with the incumbent process including reconciliations, exception handling and end-of-day balances. A simulation using only payments that settle smoothly gives an unduly favourable estimate. Include delayed messages, a closed market and a participant that cannot supply funds on time.

  1. Test in phases

    Break a large technology question into stages, each with its own report and decision point.

  2. Publish the code

    Release specifications and source code so firms can build on the work.

  3. Measure liquidity, not speed

    Judge new settlement systems by how much cash banks need to hold during the day.

What this plan gives up

Experiments built expertise and international partnerships at low risk, but a successful prototype does not prove that banks will pay to adopt a new system in production.

The strongest counter-argument

The existing system benefits from established rules, oversight and operational experience. A new platform must make responsibility for mistakes and the point of settlement finality equally clear. A pilot may still generate value by revealing which processes need reform even if the technology tested is never adopted at scale.

Metrics to watch

  • peak intraday liquidity required for final settlement
  • liquidity tied up between payment legs
  • Commercial networks built on Ubin designs
  • Intraday liquidity savings
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.