On 16 August 2017 Sarawak Energy reported completion of its acquisition of Sarawak Hidro from the federal government for RM2.5 billion. Its annual report identifies Bakun as a 2,400 MW hydroelectric facility and describes the opportunity to integrate its operations into the wider generation portfolio. Installed megawatts measure possible instantaneous output under appropriate conditions. Annual energy depends on water, operating constraints, transmission and demand.
The 2017 report says the transaction made Sarawak Energy the sole owner and operator of Bakun. That control is relevant to integration but cannot create water during a dry spell. The physical resource and the contractual right to decide when to use it should enter different lines of the model.
The Bakun hydroelectric plant on the Balui river in Sarawak is Malaysia’s largest, with eight 300 MW turbines and a 205-metre rockfill dam. Planned since the 1980s, it went through several ownership and design changes; construction began in 1996, the dam was completed in 2010 and the plant was fully commissioned in July 2014. Reported costs reached about RM7.3 to RM7.4 billion including financing. It was owned by the federal government through Sarawak Hidro, which sold its output to Sarawak Energy.
In March 2017 the Sarawak government announced it would buy Sarawak Hidro from the federal Ministry of Finance for RM2.5 billion. Sarawak Energy completed the purchase on 16 August 2017, funding it with internal cash and external financing, while the Ministry of Finance kept its guarantee on Sarawak Hidro’s existing debts, reported at about RM6.4 billion. The acquisition gave Sarawak Energy full ownership and operation of all of the state’s major power plants, alongside the 944 MW Murum and 100 MW Batang Ai dams, and the 1,285 MW Baleh dam then starting construction.
Owning Bakun outright lets Sarawak Energy manage the reservoir, the other dams and its thermal plants as one system. That matters because Sarawak’s demand had grown quickly, from about 1,000 MW in 2009 to about 3,500 MW by 2018, much of it from energy-intensive industries attracted by hydropower.
Key moments
Construction of Bakun begins
Dam completed; impoundment begins
Fully commissioned
Sarawak announces the acquisition
Sarawak Energy completes the purchase of Sarawak Hidro
Plant formally handed over to the state
Bakun acquired for RM2.5 billion in August 2017. Sources: Sarawak Energy; Malay Mail; Enerdata.
The trade-offs at the heart of the case
Buy the incremental rights
An owner may coordinate hydro storage with thermal generation, schedule maintenance differently or earn a greater share of future demand growth. It also takes on maintenance, hydrological variability and other obligations. A comparison with building a replacement dam from scratch would overlook the electricity already available under the old arrangement. Start instead with the cash flows Sarawak Energy expected as a buyer of power and show what changed with control.
The dam belongs in a system dispatch plan
Give the system operator the same water inflow and customer load under two ownership arrangements. Compare which generators run, what must be bought and who can authorise the relevant dispatch decision. A gain that appears in both versions was already available before acquisition. A gain that appears only when one owner coordinates maintenance and water release is a genuine candidate for the acquisition case. The size of the dam makes that distinction more important, not less.
For your seminar, paper or interview
- Q1
Which benefits were already bought under existing power arrangements?
- Q2
How would a dry year affect both volume and value?
- Q3
What operating obligation changes hands with equity ownership?
- Q4
How would coordinated maintenance change the value of ownership?
- Q5
Which estimate needs a full system dispatch model?
- Vertical integration
- System dispatch and storage
- Acquisition valuation
- State energy policy
How we would approach it
Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.
Buying Bakun consolidated Sarawak’s generation under one owner, allowing coordinated dispatch of water and thermal capacity. At RM2.5 billion, well below the plant’s construction cost, the purchase gave the state control of a strategic asset at a modest equity price.
Optimise the reservoirs
Coordinate releases across Bakun, Murum and Baleh.
Grow demand responsibly
Match new industrial customers to available supply.
Plan major maintenance
Schedule turbine overhauls when water and demand allow.
What this plan gives up
Full control enables system-wide planning but places all hydrological risk on one owner.
The strongest counter-argument
The headline price excludes billions of ringgit of existing debt, so the true cost is higher. Single ownership also concentrates hydrological and operational risk in one company.
Metrics to watch
- Sarawak Energy’s generation mix
- Completion of the Baleh dam
Propose your solution
Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.
Published solutions
Loading published solutions…
- Sarawak Energy: completion of the Bakun acquisition ↗
- Sarawak Energy: 2017 annual report on acquisition and integration ↗
- Sarawak Energy: completes acquisition of Bakun HEP ↗
- Malay Mail: Sarawak Energy now in control of Malaysia’s largest dam ↗
- Enerdata: SEB completes acquisition of the 2.4 GW Bakun dam ↗
- The Borneo Post: Sarawak takes over Bakun HEP ↗
- Image: Bakun Dam in Sarawak. Photograph: Mohamad Shoox, CC BY 2.0 (cropped and resized) ↗