What happened
Peru’s transport ministry announced that a five-kilometre, five-station section of Line 2 would begin carrying passengers in a trial phase on 21 December 2023. It described the service as temporarily free and required a boarding card. The pilot covered a short stretch in eastern Lima. A passenger could try the train out of curiosity or switch for a single leg without finding it useful for a whole regular commute.
Use entries by time, repeat card use and end-to-end travel surveys to separate a first visit from regular demand. Record the cost of reaching the station and any fare on a connecting service. When the route expands it will connect more origins and destinations. That network effect can increase willingness to pay, while the introduction of a fare can reduce measured trips. Inferring either effect from the original trial alone is difficult because both the product and its price change.
A pilot station can count every entry and still miss the residents who found it too expensive or time-consuming to reach the station. Interview households at origins as well as people on platforms. Ask how they travelled previously, where they actually need to go and whether the new trip replaced another trip or added a leisure outing. Then match the survey to observed use in later weeks. A high number of first-time riders followed by few return journeys is a different commercial signal from the same total produced by daily commuters. For the social account, both groups may receive value, but an operator planning weekday service needs to know which peaks persist after the initial curiosity fades.
Lima is one of the largest cities in Latin America, but its public transport has long been dominated by buses and minibuses. Residents in some areas spend hours commuting each day.
Line 2 of the Lima and Callao Metro is Peru’s first underground metro line. It is designed to run 27 kilometres with 27 stations from Ate in the east to the port of Callao in the west, linking with Line 1 and the Metropolitano bus rapid transit.
The concession was signed in 2014, with a construction period of five years. The World Bank lists the total project cost at about US$5.8 billion, including a branch of the future Line 4 towards the airport.
The project faced long delays, including difficulties in acquiring land and relocating utilities. A five-kilometre, five-station pilot section, Stage 1A, began carrying passengers in a trial phase on 21 December 2023.
The pilot section in eastern Lima moved about 41 million passengers in its first stage of operation, according to official figures, showing strong demand even for a short stretch.
When complete, Line 2 is expected to carry more than a million passengers a day and cut the journey from Ate to Callao to about 45 minutes.
The case illustrates the challenges of large urban rail projects worldwide, from London’s Elizabeth line to Bogotá’s metro, where delays and cost increases are common.
For students, it also shows how phased opening can deliver early benefits while the full network is completed.
Underground construction is particularly challenging in a dense city. Tunnel boring machines must avoid damaging buildings and services, while stations require large excavations in busy streets.
Financing came from several sources, including the national government, private concessionaires and multilateral lenders such as the World Bank and the Andean Development Corporation. Delays increase costs for all parties, as interest accumulates and contracts must be renegotiated.
By late 2024, tunnelling had reached Plaza Bolognesi in Breña, completing about 18 of the 27 kilometres of tunnel planned for the line. Official estimates have pointed to full operation later in the decade.
The pilot section’s ridership suggests strong latent demand for fast, reliable public transport in Lima. Each additional section that opens should increase the value of the whole line, because passengers can make more journeys without changing modes.
For investors and lenders, however, delays mean that revenue starts later while interest and other costs continue, which reduces the project’s financial return.
Public-private partnerships for metro lines must therefore allocate risks carefully, including the risk of delays caused by land acquisition and utility relocation, which are often outside the builder’s control.
For Lima’s residents, the main measure of success will be shorter, more reliable journeys across one of the world’s most congested cities.
Its progress is therefore watched closely by commuters, investors and multilateral lenders alike, and each new section that opens will provide evidence about demand and operating costs that can inform future metro lines in Lima and other Latin American cities.
Key moments
The ministry announced a card requirement for the initial trial section.
The start of passenger trials was scheduled on the five-station starter section.
Sources: Peru transport ministry; El Peruano.
The trade-offs at the heart of the case
The trip from the passenger’s perspective
A short, initially fare-free Line 2 section helps reveal operating patterns while leaving paid demand uncertain. Line 1’s frequency change helps reveal who saves waiting time on an established service. Door-to-door observations make a better common denominator than a count of trains.
For your seminar, paper or interview
- Q1
How would repeat card use improve the ridership estimate?
- Q2
Who is absent from a short pilot even if they would use the completed line?
- Q3
What information would give a credible estimate of fare sensitivity?
- Q4
Which pre-intervention trends would support the proposed comparison group?
- Q5
What result would make the estimated effect unsuitable for a financial valuation?
- Urban rail
- Public-private partnership
- Project delays
- Phased delivery
How we would approach it
Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.
We think Line 2 is a vital investment for Lima, but its long delays show the cost of complex underground projects. Opening a short pilot section gave residents early benefits, yet the full value will only come when the line connects Ate with Callao.
Open in stages
Deliver sections as they are ready.
Resolve land issues
Speed expropriation and utility relocation.
Integrate fares
Link Line 2 with Line 1 and buses.
What this plan gives up
Phased openings deliver early benefits but limited network value.
The strongest counter-argument
Some argue bus rapid transit would have served more people faster at lower cost.
Metrics to watch
- Daily passengers
- Construction progress
Propose your solution
Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.
Published solutions
Loading published solutions…
- Ministry of Transport and Communications — Line 2 starter section and trial opening ↗
- Ositrán — Supervision of the Line 2 trial ↗
- World Bank • Peru Lima Metro Line 2 Project ↗
- El Peruano • Line 2 moved 41 million passengers in first stage ↗
- AFD • Developing efficient and sustainable public transport in Lima ↗
- Photo: Interior del tren linea 2 by Informacion 2023, CC0 (cropped and resized) ↗
Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.