Case study · South AfricaWater and catchmentsRecycling works commissioned in 2001Last reviewed 22 November 2026

South Africa case studiesAfrica case studies

South Africa

A second market for Durban’s treated water

A city can treat water to drinking quality, deliver it to an industrial process and never need potable quality at that point of use. Meanwhile treated wastewater leaves the urban system. Durban faced an allocation question. Could industrial demand be met with reclaimed water so that scarce potable supply remained available for other uses?

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

Designed treatment capacity, not average daily deliveries47.5 ML/day
01 · The situation

What happened

A city can treat water to drinking quality, deliver it to an industrial process and never need potable quality at that point of use. Meanwhile treated wastewater leaves the urban system. Durban faced an allocation question. Could industrial demand be met with reclaimed water so that scarce potable supply remained available for other uses?

The Durban Water Recycling Works began production in 2001 at the Southern Wastewater Treatment Works. Under a public–private arrangement, further treatment produced water for industrial customers, supplied separately from household drinking water. Both the treatment chain and the presence of customers able to use a dependable volume were essential to the arrangement.

The plant was designed for 47.5 million litres a day. The study estimated that operation at capacity could meet the equivalent of about seven percent of Durban’s 2005 potable demand. The comparison describes potential displacement. It is distinct from a measured daily average, and subsequent demand can change the percentage even if the plant itself never changes size.

The Durban Water Recycling Works began production in 2001 at the Southern Wastewater Treatment Works. Under a public-private partnership, a private operator treats municipal wastewater to a high standard and supplies it to industrial customers, mainly a paper mill and a refinery, through a separate pipeline.

The plant was designed for 47.5 million litres a day. A study estimated that running at full capacity could replace the equivalent of about 7 percent of Durban’s potable water demand in 2005.

Industrial reuse is attractive because large industrial users can take steady volumes and do not need water treated to drinking standards. Every litre of reclaimed water they use is a litre of drinking water left for households.

The partnership model shifted construction and operating risk to a private company, which earned revenue from selling the water. The World Bank has studied eThekwini’s experience as part of work on industrial water reuse partnerships.

Water reuse is growing worldwide, from Singapore’s NEWater to schemes in Namibia, as cities look for supplies that do not depend on rainfall.

For the municipality, the arrangement turned a disposal problem into a revenue stream. Wastewater that would otherwise be discharged after treatment instead became a product sold to industry, while drinking water saved could serve a growing population.

For the industrial customers, recycled water offered a supply that did not depend directly on rainfall and that was suited to their processes. The main risk for both sides is that the value of the plant depends on a small number of large customers. If one reduces production or closes, the plant may run below capacity while its fixed costs continue.

This is a familiar issue in infrastructure finance. Projects that serve a few anchor customers often rely on long-term contracts that commit those customers to buy agreed volumes, giving lenders and operators confidence that revenue will cover debt and operating costs.

Durban’s experience is regularly cited in South African discussions of how reuse could ease pressure on stressed water systems in other cities.

The plant’s technical design reflects the needs of its customers. Industrial users require water with consistent quality, particularly for processes such as papermaking and refining, where impurities can damage equipment or products. Treating to a specified standard, rather than to drinking quality, keeps costs closer to what the customers can afford.

Public-private partnerships of this kind allocate risks to the party best able to manage them. The private operator takes on the technical and operating risk of running the plant, while the municipality retains ownership of the wastewater resource and the broader responsibility for water services in the city.

Students can use the case to compare the price of recycled water with the cost of developing new potable supply, which is usually the decisive figure when cities weigh up reuse projects.

02 · Timeline

Key moments

  1. Durban Water Recycling Works begins production.

  2. Capacity equals about 7% of Durban’s potable demand at that time.

  3. eThekwini explores further industrial reuse partnerships.

03 · Exhibit
Exhibit 1 · Durban Water Recycling Works
million litres per day47.5Design capacity

Source: Water Research Commission case study. Design capacity, not average delivery.

04 · Core tensions

The trade-offs at the heart of the case

Our assessment

Before financing an expansion, establish whether the limiting factor is treatment capacity, delivery pipes or demand from users. A capacity addition has little value if the existing outlet cannot deliver the water on the days buyers need it. Compare records of delivered volumes with service interruptions before choosing a remedy. One risk in interpreting an industrial reuse scheme is to describe a payment by the buyer as the whole social benefit. The buyer pays and the supplier receives. The resource question is whether that transaction releases drinking-water capacity, avoids a treatment or disposal cost, or requires new energy and infrastructure. Those effects need separate entries. If there is spare potable capacity today but a future shortage is likely, the value may be partly the option to supply more people later. Keep that timing explicit. A forecast benefit years from now is not cash available for today’s operating budget.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    Who could be missing from the reported measure of potable supply displaced at industrial connection points?

  2. Q2

    Which part of operation of the separate reclaimed-water network must be financed every year?

  3. Q3

    How would evidence on actual purchases and the prior water source affect your choice?

Frameworks worth applying
  • Public-private partnership
  • Water reuse
  • Industrial demand
  • Resource allocation
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

We think Durban’s recycling works is a strong example of matching water quality to use. Supplying treated wastewater to industries that do not need drinking-quality water frees potable supply for households, which makes it a smart allocation of a scarce resource.

  1. Find anchor customers

    Secure industrial users before building capacity.

  2. Price fairly

    Set tariffs that reflect treatment costs.

  3. Expand gradually

    Add capacity as demand grows.

What this plan gives up

Reuse frees drinking water but depends on industrial customers that can change demand.

The strongest counter-argument

Some argue investing in leak reduction is cheaper than building new treatment capacity.

Metrics to watch

  • Volume of recycled water sold
  • Potable water freed for other users
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.