Finding the water that Khayelitsha never meant to use

A household may be asleep while water still moves through the pipes outside. Some of that flow is legitimate night use. Some escapes through leaks, and the pressure that makes water available to customers also pushes it through damaged fittings. Buying more bulk water would meet the higher recorded demand without explaining how much of it customers actually wanted.

Suggested for: MBA strategy · Corporate finance · Facts as of 22 November 2026

Reported annual water saving in the project area9 million m³
01 · The situation

What happened

A household may be asleep while water still moves through the pipes outside. Some of that flow is legitimate night use. Some escapes through leaks, and the pressure that makes water available to customers also pushes it through damaged fittings. Buying more bulk water would meet the higher recorded demand without explaining how much of it customers actually wanted.

Engineers examined night flows into Khayelitsha and identified a large opportunity to manage pressure. The project changed how water entered the distribution area, reducing excessive pressure during periods of low demand. An early assessment inferred from night-time use that leakage might account for almost three quarters of the water supplied. That was an estimate used to investigate a problem, rather than a meter reading at every leak.

The project account reports annual savings of around nine million cubic metres. This is water no longer required at the network entry point. It has a financial value to the municipality, but a cubic metre saved from leakage does not automatically produce the same revenue as a cubic metre sold to a customer.

Khayelitsha is one of Cape Town’s largest townships. Analysis of water flowing into the area at night, when legitimate use is low, suggested that leakage accounted for a very large share of supply, an estimate that guided the response rather than a direct measurement of every leak.

The project installed pressure-reducing equipment that lowered water pressure in the network during low-demand periods, cutting the rate at which water escaped through damaged pipes and fittings. The project account reports annual savings of around nine million cubic metres.

Water lost through leaks is part of what utilities call non-revenue water: water that is treated and pumped but never billed. Reducing it lowers costs for bulk water and treatment and makes existing supplies go further.

Pressure management became an important part of Cape Town’s water conservation strategy, and the city’s experience in managing pressure across its network helped it respond during the later drought.

Utilities in many countries use similar techniques, often achieving payback periods of months rather than years.

The economics are straightforward. A pressure-management installation is a one-off capital cost followed by modest maintenance. The benefit is a lower volume of bulk water that the municipality must buy or treat every year. When annual savings are large relative to installation cost, the payback period is short.

Pressure also affects how often pipes burst. Lower and steadier pressure reduces stress on old infrastructure, which can lower repair costs over time. These indirect benefits are harder to measure but matter to an asset manager deciding where to spend a limited maintenance budget.

There are limits. Pressure must stay high enough for customers on higher ground and for fire-fighting, so engineers set different pressures for different times of day. Pressure management also does not fix a leaking pipe: it slows the loss until repairs or replacement can be funded.

The International Water Association and many national regulators treat non-revenue water as a key indicator of utility performance, because every litre lost has already absorbed the cost of collection, treatment and pumping.

Khayelitsha’s experience matters beyond Cape Town because many cities lose a large share of the water they produce before it reaches a paying customer. In fast-growing urban areas, networks are often extended quickly and maintained later, which leaves old and new pipes operating under pressures that were never designed for the whole system.

For a municipal finance officer, the attraction of pressure management is that it can be justified on cost savings alone. The water no longer lost does not need to be bought, treated or pumped, so the savings show up directly in the operating budget. That makes it easier to fund than projects whose benefits are spread across many stakeholders.

The project also shows why measurement comes first. Engineers could only design the intervention once they had analysed night flows and identified where pressure was highest. Without that data, the utility would have had little basis for deciding where to invest.

02 · Timeline

Key moments

  1. Engineers analyse night flows into Khayelitsha.

  2. Pressure management installation reduces night-time pressure.

  3. Project reports about 9 million m³ saved per year.

03 · Exhibit
Exhibit 1 · Reported annual water saving from Khayelitsha pressure management
million cubic metres per year9Annual saving

Source: WRP project account of the Khayelitsha pressure management project.

04 · Core tensions

The trade-offs at the heart of the case

Work through the evidence

Separate a hydraulic test from a budget estimate. Compare inlet flow before and after the intervention at equivalent times, then check pressure at the least well-served connections. Only after confirming that customers still receive an adequate service should the planner value reduced purchases, energy use or deferred capacity. A lower inlet reading could otherwise combine leak reduction with an unwanted decline in service. Sort complaints by location and time. Low pressure at an elevated property during the dinner-hour peak and high night flow at the inlet are compatible observations. A response that optimizes one measurement at one location can miss the other. Ask whether the area’s records allow these conditions to be seen on the same day.

05 · Discussion questions

For your seminar, paper or interview

  1. Q1

    Who could be missing from the reported measure of hours of adequate pressure at a sample of connections?

  2. Q2

    Which part of installation, monitoring and continuing valve maintenance must be financed every year?

  3. Q3

    How would evidence on night flow paired with daytime service complaints affect your choice?

Frameworks worth applying
  • Non-revenue water
  • Asset management
  • Pressure management
  • Cost-effectiveness
06 · Our view

How we would approach it

Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.

We think pressure management is one of the best-value investments a water utility can make. Lowering pressure at night reduces leaks without asking customers to use less, so it should be standard practice in large networks with high losses.

  1. Measure night flows

    Use minimum night flow to estimate leakage.

  2. Install pressure control

    Manage pressure by time of day.

  3. Fix leaks too

    Combine pressure management with repairs.

What this plan gives up

Lower pressure saves water but must still meet fire-fighting and peak needs.

The strongest counter-argument

Some argue replacing old pipes is the only lasting solution to leakage.

Metrics to watch

  • Minimum night flow
  • Bulk water purchases
07 · Your turn

Propose your solution

Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.

Submissions are moderated and must relate to this case. Your name, programme and text are stored on our hosting provider and may be published; no email address is collected. Please don’t include personal contact details or confidential information.

Published solutions

Loading published solutions…

Sources

Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.