What happened
When a rural road is in good condition, many days of minor maintenance leave little visible evidence. When drains block or a small defect grows, a later repair becomes highly visible and more disruptive. The provincial road authority also faced a social objective, providing predictable earnings to households with few other opportunities.
Zibambele engaged people from vulnerable rural households, especially women-headed households, for routine labour-intensive road maintenance in return for a stipend. Provincial budget documents describe a commitment of 64 hours a month or around two days a week. The program linked an income-support arrangement to a defined maintenance responsibility.
The documents establish the type of work, intended participants and contracted time. They do not establish that every road improved by the same amount or that all work recorded was additional. A road can remain passable after heavy rain because it was maintained, because the rainfall missed it or because another crew intervened.
Zibambele, meaning ‘doing it ourselves’, was started in 1999 by the KwaZulu-Natal Department of Transport as a poverty-relief project. It later became part of the Expanded Public Works Programme.
Each contractor, usually a woman heading a poor rural household, is responsible for routine, low-intensity maintenance on a defined section of road: cleaning the road surface, clearing drains and channels, and cleaning verges. In eThekwini, the municipality describes assigning participants a stretch of between 300 metres and half a kilometre.
The programme targets women deliberately. Research suggests that about 95 percent of contractors are women, and the work is part-time so that it can fit around other responsibilities.
Its scale is substantial. In 2015 the national government reported that about 40,000 people were employed in the programme, which contributed to maintaining the provincial road network within a total infrastructure maintenance budget of R400 million for 2015/16.
Contractors also formed savings clubs. By around 2011 they had collectively saved more than R6 million, showing how regular income can support household financial planning.
The programme has been recognised as a best-practice example of labour-intensive road maintenance and has inspired similar programmes elsewhere in South Africa, including S’hamba Sonke.
The financial logic is simple: small, regular spending on maintenance prevents larger repair bills later. This is the same reasoning behind sinking funds and preventive maintenance in companies.
Because contractors live near the roads they maintain, they can spot problems early and often have a personal interest in keeping the road usable. That local knowledge is difficult for a distant maintenance crew to replicate.
The programme also illustrates how public spending can be designed to achieve two goals at once: protecting a public asset and supporting household income.
Rural roads matter for household finances. They connect villages to clinics, schools, markets and jobs, and a road that becomes impassable in the rainy season raises the cost of every journey.
Evaluating the programme therefore involves two questions: whether the roads are in better condition than they would otherwise be, and whether participating households are financially more secure.
The model shows how a public works programme can be built around a real, recurring need rather than short-term projects, which helps make the employment it offers sustainable year after year.
Key moments
KwaZulu-Natal Transport Department launches Zibambele.
Contractors’ savings clubs have saved more than R6 million.
Programme employs about 40,000 participants.
Source: South African Government media statement, 2015.
The trade-offs at the heart of the case
Work through the evidence
For a specific segment, pair a maintenance log with observations made under comparable seasonal conditions. Record which tasks were within the participant’s responsibility and which required machinery or a larger crew. If a culvert fails because a major repair was deferred, attributing the whole failure to the person clearing nearby drains would assign the wrong financial responsibility. Compare conditions and response times after a reported defect. Trace a drainage problem from the day a worker notices it to the day it is repaired. If the task requires machinery, the local contract may have worked correctly by identifying it early. The useful measure is the complete response time, not merely whether the participant could finish the repair using hand tools.
Our assessment
Preserve a route for small problems to reach the unit that can authorize larger repairs. Assess whether workers receive predictable paid hours and whether maintenance helps keep routes usable. These objectives deserve separate measures even when the same day’s work contributes to both. The contract uses local labour for tasks suited to repeated attention. Comparing it with one large maintenance contract requires care. A contractor using machinery may finish a major repair more quickly, while a local worker notices a small defect long before it would justify dispatching a machine. The suitable alternative depends on the defect and its speed of deterioration. A public works appraisal should also recognize the income objective explicitly rather than hiding it inside an unusually high or low unit cost for road work. Report what was spent on routine prevention, what was escalated and how earnings reached the intended households.
For your seminar, paper or interview
- Q1
Who could be missing from the reported measure of days a road segment stays passable under similar conditions?
- Q2
Which part of tools, stipends and escalation of major defects must be financed every year?
- Q3
How would evidence on reported defects resolved by the appropriate maintenance team affect your choice?
- Routine maintenance
- Labour-intensive works
- Women’s employment
- Asset management
How we would approach it
Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.
We think Zibambele is a model of how to fund routine maintenance. Paying local households to keep a stretch of road clear prevents small problems becoming costly repairs, while providing steady income to women in rural areas.
Protect the maintenance budget
Fund routine work every year.
Assign clear stretches
Give each contractor defined responsibility.
Support savings
Encourage savings clubs among contractors.
What this plan gives up
Routine maintenance is cheaper than repair, but its benefits are hard to see.
The strongest counter-argument
Some argue mechanised maintenance is more efficient on busy roads.
Metrics to watch
- Kilometres maintained
- Road condition ratings
Propose your solution
Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.
Published solutions
Loading published solutions…
- KwaZulu-Natal Provincial Treasury • transport budget and Zibambele ↗
- KwaZulu-Natal transport estimates • routine road maintenance ↗
- Vuk’uzenzele • Zibambele started in 1999 ↗
- South African Government • Zibambele Road Maintenance Programme (2015) ↗
- UKZN • Zibambele and sustainable livelihoods (Khoza) ↗
- eThekwini Municipality • Sihlanzimvelo and Zibambele ↗
- Photo: Sani Pass heading into Lesotho by Vaiz Ha, CC BY 2.0 (cropped and resized) ↗
Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.