What happened
A biomass generator can know its electricity strike price and still lose money on the next megawatt-hour. Drax’s third biomass conversion reused an existing generating site while changing what the operator had to buy, transport and burn. The European Commission approved the contract in December 2016. The relevant investment question was how much of the margin remained exposed after a key source of revenue uncertainty had been reduced.
Wood pellets have to reach the plant in suitable condition. Moisture content, energy content, transport and handling affect the number of saleable megawatt-hours the operator obtains from a tonne. A rise in delivered fuel cost can compress the spread even if eligible power earns an indexed £100 per megawatt-hour in the contract’s price base. General consumer-price inflation and the delivered price of a particular fuel need not move together.
Compare two suppliers quoting different prices per tonne. Convert each into usable heat and then into electrical output after the actual conversion losses. Add handling and any incremental cost associated with the applicable sustainability requirements. A cheaper tonne can become the dearer megawatt-hour, and averaging historic fuel invoices can hide a change in quality that drives the result.
Drax’s announcement applied to the third biomass unit conversion. The company’s other activities and electricity sales were outside that particular announcement. A reader estimating earnings should therefore identify eligible output from the covered unit before applying the strike. Using generation from the whole station would extend the support to megawatt-hours for which the source establishes no such entitlement. This seemingly small boundary check can dominate a long-term valuation.
Select a shipment and allocate its delivered cost to the electricity ultimately exported. Inventory may have moved across a reporting date, so purchasing cost and generation should be matched by lot or a consistent inventory method. Allow for moisture, conversion efficiency and electricity consumed in the plant. Next compare the result with output from an otherwise similar lot under different operating conditions. The exercise may identify a procurement opportunity, an operating problem or merely a timing difference. It also clarifies the limits of a revenue guarantee. Stabilising the price received for eligible electricity does not stabilise the number of saleable units obtained from a tonne of purchased fuel.
Drax power station near Selby in North Yorkshire was once Britain’s largest coal plant. From 2013 it converted four of its six units to burn wood pellets, mostly imported from North America. Support came through two schemes: the Renewables Obligation and a contract for difference. In December 2016 the European Commission approved UK support for converting a further unit under a CfD with a strike price of £100/MWh in 2012 prices, rising with inflation.
Under that structure the generator receives a top-up when the market price is below the strike price, but its profit still depends on fuel. Pellets have to be harvested, processed, shipped across the Atlantic and moved by rail, and their price and the plant’s efficiency determine the margin. Ember calculated that Drax received £8.72 billion of RO and CfD payments between 2012 and 2025, including a record £999 million in 2025.
With the existing support ending in March 2027, the government agreed in 2025 a new low-carbon dispatchable CfD covering all four biomass units from April 2027 to March 2031, at a strike price finalised at £109.90/MWh in 2012 prices. Generation is capped, and the government said the deal would roughly halve support, estimating total payments of about £1.88 billion over four years.
Critics argue that burning wood is not as low-carbon as accounting rules suggest, because regrowing forests takes decades to reabsorb the carbon released. Supporters say the plant provides reliable power when wind and solar output is low. The new contract requires Drax to show that all biomass comes from sustainable sources.
For students of finance, Drax shows how a company’s earnings can depend more on the design of a government contract than on its own operations, and why investors watch policy decisions as closely as fuel prices.
Drax argued the new deal would save consumers money compared with building or contracting other sources of reliable power.
Key moments
The UK notifies support for a coal-unit conversion to biomass.
The Commission approves support and Drax confirms the strike price.
Fuel procurement and output determine the realised margin.
Drax received £8.72bn of Renewables Obligation and CfD payments from 2012 to 2025. The 2027–31 estimate is in 2023/24 prices. Sources: Ember (2026); Minister Shanks letter to ESNZ Committee (2025).
The trade-offs at the heart of the case
What to watch
The practical unit of comparison is the unit the customer pays for. A generator buys tonnes and sells electricity. A fall in the purchase price per tonne can be offset by worse quality or more electricity consumed on site. A credible budget bridges tonnes purchased to usable fuel, usable heat to gross generation and gross to net exports. Performance can then be evaluated at the step where the loss occurred instead of being attributed to a vague deterioration in margin.
For your seminar, paper or interview
- Q1
Which part of the input cost is least likely to track CPI?
- Q2
When would a flexible fuel contract justify a higher quoted price?
- Contracts for difference
- Fuel cost risk
- Subsidy design
- Windfall profits
How we would approach it
Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.
Run the investment case against delivered fuel costs, measured conversion performance and practical storage constraints. Keep separate records for power-price settlement and fuel purchase. A hedge that protects the quoted commodity price may leave transport, quality or currency exposure.
Convert coal units to biomass
Burn imported wood pellets instead of coal.
Secure a CfD
Fix a strike price of £100/MWh (2012 prices), approved by the EU in December 2016.
Agree a bridge deal to 2031
Accept a capped CfD with lower total support from 2027.
What this plan gives up
Biomass kept a large, controllable power station running and cut coal use, but it relied on billions in subsidies and on wood-pellet supply chains whose sustainability is disputed.
The strongest counter-argument
Metrics to watch
- Drax’s generation under the cap
- Biomass sustainability rules
Propose your solution
Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.
Published solutions
Loading published solutions…
- Drax: approval of the third unit’s contract for difference ↗
- European Commission: Decision (EU) 2017/1494 ↗
- Northern Ireland Audit Office: Non-Domestic Renewable Heat Incentive Scheme ↗
- Ember: £1bn but falling, record subsidy for UK biomass burning ↗
- UK Parliament: Minister Shanks to ESNZ Committee, cost of Drax support 2027–2031 ↗
- Bloomberg: Drax finalizes deal for government biomass subsidies ↗
- CMA Subsidy Advice Unit: Report on Drax CfD (2025) ↗
- Ember: UK biomass phase-out is now in sight ↗
- Image: AI-generated editorial illustration
Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.