What happened
A geothermal field can contain useful heat without supplying a single additional unit of electricity. Wells, steam collection, generating units and transmission must work together. Each stage carries a different financing risk and a different date at which a public authority can reasonably call the asset operational.
Kenya’s electricity expansion project supported components of the Olkaria development. World Bank implementation reporting distinguishes the 140-megawatt Olkaria IV unit group and the 140-megawatt Olkaria I expansion, alongside associated steam gathering and grid infrastructure. This is a case about public energy capacity rather than any investor’s financial statements.
The two additions were commissioned in late 2014 and early 2015, adding 280 megawatts of installed capacity in the project account. Megawatts measure power capacity. Annual energy delivered must be measured in megawatt-hours and depends on availability, dispatch and the network’s ability to carry output.
The World Bank implementation report identifies Olkaria IV in September 2014 and the Olkaria I addition in January 2015. Keeping both dates matters when comparing annual generation. Two plants with the same installed capacity can contribute different amounts during the calendar year in which they enter service.
Kenya is among the world’s leading producers of geothermal power, drawing on heat from the Rift Valley. The Olkaria field near Lake Naivasha is the centre of the industry, operated mainly by the state-owned generator KenGen.
The World Bank-supported Kenya Electricity Expansion Project helped finance the Olkaria IV plant and an expansion of Olkaria I, each adding 140 megawatts. Olkaria IV was commissioned in September 2014 and the Olkaria I addition in January 2015, together adding 280 megawatts of installed capacity.
Geothermal plants run almost continuously, unlike solar or wind, which makes them valuable for baseload supply. That steady output helped Kenya reduce reliance on expensive diesel-fired generation and on hydropower, which is vulnerable to drought.
The main financial risk lies in exploration: drilling wells is expensive and some do not produce enough steam. Kenya created the Geothermal Development Company to take on much of this early-stage risk, making it easier to attract investors for power plants.
Geothermal now supplies a large share of Kenya’s electricity, one reason the country’s power mix is among the cleanest in the world.
Before geothermal expanded, Kenya relied heavily on hydropower, which made electricity supply vulnerable to droughts, and on costly thermal plants burning imported fuel. Geothermal’s steady output helped stabilise supply and reduce costs.
The Olkaria field has attracted both public and private investment. Independent power producers, such as Ormat, operate plants alongside KenGen, showing how a public resource can support private power generation.
For project finance, geothermal illustrates the importance of allocating risk to the party best able to manage it. By taking on drilling risk, the state made it possible for developers to finance plants with lower risk premiums.
Capacity figures should always be read alongside energy delivered. A plant’s contribution depends on how many hours it runs, how much steam it receives and whether the grid can take its output.
Kenya continues to expand geothermal capacity in the Rift Valley, with new fields under development beyond Olkaria, including Menengai.
Because geothermal reservoirs can decline if over-exploited, careful reservoir management and continued drilling of replacement wells are needed to sustain output over a plant’s life of several decades.
For investors, Olkaria shows how a country can build a domestic energy industry by combining public development of risky early stages with private and public generation.
The result is a power source that is local, renewable and largely independent of fuel price swings, which strengthens energy security.
Kenya’s experience is now shared with neighbouring countries in the East African Rift that have similar geothermal potential.
Geothermal also creates jobs in drilling, engineering and plant operations, building technical skills within Kenya’s workforce.
Olkaria remains central to Kenya’s clean energy story and its plans for growth.
The field’s development offers lessons for any country seeking to finance large, long-lived energy projects with high upfront risk.
Key moments
Kenya’s first geothermal unit at Olkaria begins operating.
Olkaria IV units commissioned.
Olkaria I additional units commissioned.
Source: World Bank, Kenya Electricity Expansion Project implementation reports.
The trade-offs at the heart of the case
Reading the result
Add 140 megawatts at Olkaria I and 140 at Olkaria IV to obtain 280 megawatts of installed capacity. Capacity measures a rate at which electricity could be produced. Actual electricity generated over time is measured in megawatt-hours and depends on how the units operate. Customer service adds another layer because electricity must travel through the network to a user. A project account can therefore report a genuine capacity addition without guaranteeing an identical improvement in hours of supply at every house connected to the grid.
The financing decision
Compare tracking completion of generation works with evaluating how reliably electricity reaches users. Both are legitimate objectives, but the second needs operating and delivery data beyond construction records. Keep the period of actual operation visible when comparing two sets of generators.
For your seminar, paper or interview
- Q1
Which people would be missed by measuring only usable energy delivered reliably to the grid?
- Q2
Who carries the cost of steam gathering, generating equipment and transmission access?
- Q3
What could the evidence on actual generation and service reliability over time change?
- Project finance
- Renewable energy
- Capacity versus output
- Infrastructure risk
How we would approach it
Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.
We think geothermal is one of Kenya’s best long-term energy investments: steady, low-carbon power from a domestic resource. The main lesson for investors is that capacity, steam supply and transmission must be planned together to turn megawatts into delivered electricity.
Secure steam first
Drill and test wells before committing to plants.
Build transmission
Ensure lines can carry new output.
Track energy, not just capacity
Measure megawatt-hours delivered.
What this plan gives up
Geothermal provides steady power but requires large, risky upfront drilling costs.
The strongest counter-argument
Some argue cheaper solar and wind should take priority as their costs fall.
Metrics to watch
- Annual generation in GWh
- Plant availability
Propose your solution
Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.
Published solutions
Loading published solutions…
- World Bank • Kenya Electricity Expansion Project, Olkaria installed capacity ↗
- World Bank • implementation status of the electricity expansion project ↗
- Photo: Olkaria V Geothermal Power Station by Macabe5387, CC BY-SA 4.0 (cropped and resized) ↗
Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.