What happened
Lima Airport Partners announced a US$1.25 billion financing agreement for the expansion. Peru’s transport ministry subsequently certified the new airport facilities, enabling a trial phase from 15 May and full operations from 1 June 2025. Financing secured, certification and cash generation are distinct milestones. A credit agreement identifies money potentially available under its terms. It does not establish how much was drawn on a particular day or when each tenant started paying.
Separate aeronautical receipts tied to traffic from commercial receipts tied to contracts, passenger spending and open shops. During a transition, some old and new facilities may incur overlapping expenses. A passenger who has a poor connection may spend less even if the airline pays its usual charge. Look at starting dates, minimum rents, concession holidays and exclusions before converting the number of passengers into commercial revenue.
At an airport handover, an airline, baggage handler, restaurant and lender may each define the start of operations differently. Build a dated checklist using the evidence each would accept. The regulator’s certificate can establish authorisation. A signed tenant handover can start a fit-out period. A commercial rent clause may depend on opening for trade, a calendar date or a minimum traffic threshold. Debt service can start on its own scheduled date regardless. A sound budget makes room for those gaps rather than advancing every cash receipt to the official opening. This also clarifies a later review. A service transition can be operationally successful even if the concession’s early financial performance falls short of its original tenant forecast.
Jorge Chávez International Airport in Callao is Peru’s main gateway and is operated by Lima Airport Partners, a subsidiary of Germany’s Fraport, under a long-term concession.
The airport served 24.5 million passengers in 2024, more than its old terminal had been designed to handle. A second runway and a new control tower came into operation in April 2023.
Lima Airport Partners announced a US$1.25 billion financing agreement for the expansion. The broader programme, which began in 2019, was described as costing about US$2 billion, and the operator later put the total investment at more than US$2.4 billion combining its own and third-party capital.
Peru’s transport ministry certified the new facilities, allowing a trial phase from 15 May 2025 and full operations from 1 June 2025, when all flights moved to the new terminal.
The new terminal is about three times the size of the old one and is designed to handle up to 40 million passengers a year as it expands to about 270,000 square metres.
The opening was followed by early operating difficulties and debate about access roads, and the government later evaluated reopening the old terminal to increase capacity.
Lima is Fraport’s third-busiest airport, after Frankfurt and Antalya, and the operator hopes Lima can become a major hub for connections across South America.
Airport expansions worldwide, from Mexico City to Istanbul, show that building the terminal is only part of the challenge; ground transport, airline schedules and operations determine success.
Airport finance combines two main revenue streams: aeronautical charges paid by airlines and passengers, which are regulated, and commercial revenue from shops, restaurants, parking and property, which often grows faster as terminals become larger and more attractive.
The concession model means that the private operator bears much of the construction and demand risk. If passenger numbers grow more slowly than expected, revenue falls short while debt payments continue.
The operator reported that the airport ecosystem brings together more than 150 companies and generates nearly 30,000 direct jobs, highlighting the wider economic role of a major airport.
The airport’s location in Callao, surrounded by dense urban areas, makes ground access a long-term challenge. Planned links, including the future Line 4 of the metro, are expected to improve connections over time.
For the concession holder, the first years of operation in the new terminal are important for demonstrating that the investment can generate the revenue needed to repay lenders.
Its experience will be closely watched by other Latin American airports planning expansions financed through concessions.
Those results will shape future airport investment in the region.
Key moments
Lima Airport Partners secured a US$1.25 billion financing agreement.
The ministry authorised the trial phase from 15 May and full operations from 1 June.
Sources: Moodie Davitt Report; Lima Airport Partners.
The trade-offs at the heart of the case
A financing announcement before operating cash arrives
Lima Airport Partners arranged debt for an airport expansion. Auna raised equity for a multinational healthcare group. The funding decisions have different risk profiles, but neither announcement by itself shows cash already generated from passengers, tenants, patients or insurers.
Our assessment
I would stress the first repayment dates against delayed tenant openings and a slower commercial ramp. Give operations credit for a functioning terminal when the regulator’s requirements are met. Evaluate the reliability of free cash flow with passenger, collection and cost information observed later. The first achievement is essential, but shareholders and lenders have different reasons for caring about the second.
For your seminar, paper or interview
- Q1
What evidence turns an authorised credit line into cash available today?
- Q2
Which revenues can lag behind passenger transfers?
- Q3
Why would the lender and retail tenant define a successful opening differently?
- Q4
How far before the projected low point must a funding commitment become unconditional?
- Q5
Which payment could be rescheduled without weakening the receipts expected later in the forecast?
- Airport concessions
- Project finance
- Demand risk
- Infrastructure delivery
How we would approach it
Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.
We think the new Jorge Chávez terminal was a necessary investment for a capital whose airport had outgrown its old facilities. Financing it through the concession shifted construction risk to the private operator, but the return depends on traffic growth and on smooth operations after opening.
Complete ground access
Improve road links to the new terminal.
Grow connections
Attract airlines to use Lima as a hub.
Manage the transition
Resolve early operating problems quickly.
What this plan gives up
A larger terminal supports growth but adds debt and fixed costs.
The strongest counter-argument
Some argue the old terminal should have been kept in use to add capacity.
Metrics to watch
- Passenger numbers
- On-time performance
Propose your solution
Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.
Published solutions
Loading published solutions…
- Ministry of Transport and Communications — New airport operating certificate ↗
- Fraport — Lima Airport Partners’ US$1.25 billion financing ↗
- Lima Airport Partners • New Jorge Chávez inaugurated ↗
- Moodie Davitt • Landmark moment as new-look Lima Airport welcomes inaugural flight ↗
- Future Travel Experience • Fraport subsidiary opens new terminal ↗
- Photo: Aeropuerto Jorge Chavez 2025b by Entorpeditt, CC0 (cropped and resized) ↗
Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.