What happened
Chile inaugurated the 110 MW solar thermal facility in June 2021 alongside an existing 100 MW photovoltaic installation. Mirrors concentrate energy at a receiver, and molten salt stores heat for later use in a steam cycle. The project’s 17.5 hours of storage describe a design capability. They do not guarantee that the store will be full every evening or that the turbine will earn the same price throughout a discharge.
A lender comparing the two plants should construct an hourly revenue statement. A photovoltaic plant may deliver its largest volumes when other solar generators are also producing and the local price is low. Thermal storage allows a different delivery schedule but adds conversion losses, capital cost and a requirement to keep specialised equipment available. A contract rewarding a dependable evening block can change the comparison more than the annual average electricity price.
Cerro Dominador, in the Antofagasta region of the Atacama Desert, was Latin America’s first concentrated solar power plant. It was inaugurated in June 2021.
Unlike photovoltaic panels, which turn sunlight directly into electricity, concentrated solar power uses mirrors to focus sunlight on a receiver. The complex uses about 10,600 mirrors, called heliostats, each about 140 square metres, aimed at a receiver at the top of a 250-metre tower.
The concentrated heat is stored in molten salt, which can later produce steam to drive a turbine. The design allowed for 17.5 hours of storage, so the plant could generate power through the night.
The complex combines the 110 MW solar thermal plant with an adjacent 100 MW photovoltaic plant that began operating earlier.
Construction began in 2014 but was delayed when the original developer, Abengoa, ran into financial difficulties. The project was later completed under the ownership of EIG, a US investment firm, with Abengoa and Acciona as builders.
Financing came partly from development institutions. The European Union, KfW and KfW IPEX-Bank contributed a total of €113 million, including grants and loans channelled through Corfo, Chile’s development agency.
Reported costs vary by source and scope, but the project cost well over US$1 billion, far more per megawatt than a photovoltaic plant.
Concentrated solar plants also operate in Spain, Morocco, the United Arab Emirates and China, though falling battery prices have made solar-plus-battery projects a strong competitor.
The value of storage depends on when electricity is most needed. In northern Chile, solar plants flood the grid with power during the day, pushing prices down, while evening and night-time demand must be met by other sources. A plant that can deliver solar energy after dark can earn higher prices and displace fossil fuel generation.
Concentrated solar power is technically complex. Molten salt must be kept hot enough to stay liquid, and the thousands of heliostats must track the sun precisely. Any technical problems can reduce output and revenue.
The project’s long delays added to its costs, including interest during construction and the expenses of restructuring after the original developer’s financial problems.
A follow-up project at the same site, Likana Solar, later bid in an auction at US$33.99 per megawatt-hour, suggesting that developers expected costs to fall with experience.
For investors, the case shows how first-of-a-kind projects carry higher costs and risks than later projects using the same technology.
It also shows the role of public development finance in supporting new technologies that private lenders consider too risky on their own.
For students, a useful exercise is to compare the cost per megawatt-hour of storage provided by molten salt with that provided by lithium-ion batteries, using published data.
Its operating record will inform any future decisions on solar thermal plants in Chile.
It remains a landmark for clean energy in Latin America.
Key moments
The adjacent 100 MW photovoltaic facility is already operating.
The solar thermal plant is inaugurated.
Sources: Chile Ministry of Energy; pv magazine.
The trade-offs at the heart of the case
Two ways to move desert sunlight into the evening
Cerro Dominador stores heat before making electricity, while Andes Solar IIb pairs photovoltaic generation with a battery. The two facilities cannot be compared by dividing their capital budgets by a single solar megawatt figure. Trace one unit of sunshine through the energy conversion chain, measure losses and determine the hours for which delivery can be promised. A five-hour battery can be a better match for a narrow evening peak even if a thermal store lasts longer. A long sequence of valuable hours may favour a different design. Both face the possibility that more storage will flatten the very evening premium that underpins their economics. The correct benchmark is the least-cost feasible way of meeting the same delivery obligation, at the same location, with the same allowance for shortfall and degradation.
Our assessment
I would underwrite the evening block against measured heat collected, storage state and turbine availability through several seasons. Treat energy sold at a premium and the avoided cost of a shortfall as separate benefits only when the contracts permit both. A long-duration store is particularly valuable through several high-priced hours in succession. If the evening premium is brief, a cheaper plant that shifts fewer hours may capture much of the same revenue.
For your seminar, paper or interview
- Q1
Which hours should determine the comparison price for thermal storage?
- Q2
How would a sequence of cloudy mornings affect an evening delivery promise?
- Q3
When is an additional hour of storage worth very little?
- Q4
Which observations would verify demand at the time and location the capacity is available?
- Q5
Would a smaller fixed commitment or a guaranteed unit margin give better downside protection?
- Energy storage
- Renewable power
- Development finance
- Technology risk
How we would approach it
Simplifying Finance’s opinion, offered as a starting point for debate, not as fact or investment advice.
We think Cerro Dominador proved that concentrated solar power with storage can supply clean electricity after sunset in Chile. But its high cost compared with photovoltaic plants and batteries shows why investors must compare storage technologies carefully.
Value storage
Price power delivered at night.
Compare technologies
Benchmark CSP against batteries.
Use public finance
Lower risk for first-of-a-kind plants.
What this plan gives up
Thermal storage provides firm power but at high capital cost.
The strongest counter-argument
Some argue cheaper batteries have made new CSP plants hard to justify.
Metrics to watch
- Plant availability
- Cost per MWh delivered
Propose your solution
Pick a discussion question and set out what you would do, why, and what it would cost. Strong, well-argued answers are reviewed and published below with your first name and programme.
Published solutions
Loading published solutions…
- Ministry of Energy · Cerro Dominador inauguration ↗
- Acciona · Technical description and storage duration ↗
- KfW Development Bank • First CSP plant in Latin America connected to the grid ↗
- pv magazine • Latin America’s first CSP plant now online ↗
- EEAS • First thermal solar plant in Latin America built with EU support ↗
- Photo: Ministra visita planta fotosolar Cerro Dominador (32536431795) by Ministerio Bienes Nacionales, CC BY 2.0 (cropped and resized) ↗
Figures are as reported by the companies or cited outlets as of 22 November 2026. Check the source before quoting. Corrections: let us know through the solution form.